
OIL & GAS (Prepositons)
Authored by YUHAYNA CORTAZAR JIMÉNEZ
English
University
CCSS covered
Used 1+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
9 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
1. The crown block is ___ the top of the derrick.
in
at
Tags
CCSS.L.1.1I
CCSS.L.K.1E
2.
FILL IN THE BLANK QUESTION
1 min • 1 pt
2. The drill collar is ______the bit and the drill pipe sections.
Tags
CCSS.L.1.1I
CCSS.L.K.1E
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
3. A member of the crew stands__ the monkey board.
at
in
Tags
CCSS.L.1.1I
CCSS.L.K.1E
4.
FILL IN THE BLANK QUESTION
1 min • 1 pt
4. The kelly goes___ the rotary table.
Tags
CCSS.L.1.1I
CCSS.L.K.1E
5.
MULTIPLE CHOICE QUESTION
30 sec • 3 pts
The work of drilling __ the ground is performed __ the drill string.
above
by
behind
Tags
CCSS.L.1.1I
CCSS.L.K.1E
6.
FILL IN THE BLANK QUESTION
1 min • 1 pt
5. The hoisting line goes___ the drawworks.
Tags
CCSS.L.1.6
CCSS.L.3.6
CCSS.L.K.5A
7.
FILL IN THE BLANK QUESTION
1 min • 1 pt
6. The swivel is ___the hook.
Tags
CCSS.L.1.1I
CCSS.L.K.1E
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?