1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Top-down estimates are most likely to occur during the ______ phase
Concept
Planning
Execution
Delivery
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Which of the following describes the "six-tenths" rule?
Project Evaluation based on price inflation over time
Project Evaluation based on probability pricing
Cost estimation method based on size or capacity
Cost estimation method based on reference index of an item
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
The deliverables of your project are all of these except
As Built drawings
Maintenance manuals of the building project
Monthly reports to the client
Milestone: Foundations
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What should be considered when planning temporary access?
It facilitates the planned construction works
It provides safe, efficient material loading access
Is maintained throughout the construction phase
All of them
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
How many activity duration estimates are used for Program Evaluation & Review Technique?
One
Two
Three
Four
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
What is the most effective communication channel?
Emails
Social media
Face-to-Face
WhatsApp
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
For the PERT Analysis, the calculation of the duration of each activity follows:
te=(2a+4m+2b)/6
te=(a+4m+b)/3
te=(a+4m+b)/6
te=(a+4m+b)/2
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?