3.2.3 VSM Information Symbols

3.2.3 VSM Information Symbols

12th Grade

15 Qs

quiz-placeholder

Similar activities

ANS2FA- 4.02 Quiz

ANS2FA- 4.02 Quiz

9th - 12th Grade

15 Qs

Ulangan Perencanaan Produksi Masal

Ulangan Perencanaan Produksi Masal

11th Grade - University

20 Qs

Macroeconomics - p.104-120

Macroeconomics - p.104-120

9th Grade - University

11 Qs

21-22 21CB U2 Management Types Review

21-22 21CB U2 Management Types Review

9th - 12th Grade

17 Qs

Burns

Burns

10th - 12th Grade

11 Qs

PreThanksgiving Econ. Review

PreThanksgiving Econ. Review

KG - University

18 Qs

Final Manufacturing

Final Manufacturing

9th - 12th Grade

20 Qs

Monetary and Fiscal Policy

Monetary and Fiscal Policy

12th Grade - University

20 Qs

3.2.3 VSM Information Symbols

3.2.3 VSM Information Symbols

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Current State Map and the Future State Map in Value Stream Mapping?

To calculate the lead time and takt time

To understand and demonstrate the current and future states

To schedule production control

To gather verbal information

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Production Control box represent in Value Stream Mapping?

Triggering production of parts

Electronic flow of data

A central production scheduling or control department, person, or operation

General flow of information

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which symbol is used to instruct a material handler to transfer parts from a supermarket to the receiving process?

Withdrawal Kanban

Signal Kanban

Kanban Post

Production Kanban

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Signal Kanban icon indicate in Value Stream Mapping?

Scheduling using MRP/ERP

A location for kanban signals

On-hand inventory levels in the supermarket

A pull system for subassembly processes

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of the Sequenced Pull icon in Value Stream Mapping?

To gather information visually

To give instructions to subassembly processes

To batch kanbans

To level the production volume and mix

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which reference source provides information on Lean Production and Lean Thinking?

Womack, J.P., Jones, D.T. and Roos, D., 1995

http://www.massmac.org

William, M.F., 2000

http://www.strategosinc.com/present_vsm.htm

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Verbal Information icon represent in Value Stream Mapping?

Triggering production of parts

Electronic flow of data

Scheduling using MRP/ERP

Verbal or personal information flow

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?