2.2.3 Standard Work Combination Sheet Quiz

2.2.3 Standard Work Combination Sheet Quiz

12th Grade

15 Qs

quiz-placeholder

Similar activities

Final ACT quiz

Final ACT quiz

11th - 12th Grade

20 Qs

Entrepreneurship

Entrepreneurship

12th Grade

20 Qs

PAES Lab Study Guide

PAES Lab Study Guide

9th - 12th Grade

14 Qs

Foods 1 - 4.02 Yeast Breads

Foods 1 - 4.02 Yeast Breads

9th - 12th Grade

20 Qs

The Engineering Design Process (FoT Unit 2, 12 Steps)

The Engineering Design Process (FoT Unit 2, 12 Steps)

9th - 12th Grade

10 Qs

Practicum Spring Midterm '24

Practicum Spring Midterm '24

12th Grade

15 Qs

Job Vocabulary-Both

Job Vocabulary-Both

9th - 12th Grade

15 Qs

Senior Cosmetology Orientation Quiz

Senior Cosmetology Orientation Quiz

12th Grade

12 Qs

2.2.3 Standard Work Combination Sheet Quiz

2.2.3 Standard Work Combination Sheet Quiz

Assessment

Quiz

Specialty

12th Grade

Hard

Created by

Nurhana Juraimi

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of the Standard Work Combination Sheet?

To balance operator load

To certify ISO 9000 standards

To analyze value adds

To ensure workers follow documented processes

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the heart of ISO 9000 certification focus on?

Balancing operator load

Thorough documentation of processes

Certifying standard work instructions

Analyzing value adds

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which elements are identified in production time during Work Standardisation?

Takt time, Value added time, Lead time

Idle time, Processing time, Machine time

Lead time, Takt time, Machine time

Processing time, Machine time, Value added time

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of Work Standardisation?

To increase work redundancies

To reduce idle times

To create work load imbalances

To prolong processing time

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Why is it important for workers to follow the Standard Work Combination Sheet?

To increase work redundancies

To prolong processing time

To create work load imbalances

To ensure processes are under control

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the Value adds analysis & pie chart in the Standard Work Combination Sheet focus on?

Balancing operator load

Analyzing value adds

Thorough documentation of processes

Certifying ISO 9000 standards

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Operator load balancing & bar chart in the Standard Work Combination Sheet help achieve?

Thorough documentation of processes

Balancing operator load

Analyzing value adds

Certifying ISO 9000 standards

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?