1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Where are the statutory requirements for the installation of drainage systems?
BS 6700
BS EN 12056
Building regulations
WRAS
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Identify this type of stack system.
Primary ventilated stack
Secondary ventilated stack
Ventilated discharge branch stack
Stub stack
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If a discharge branch has a gradient of 18mm per metre and the branch is 3 metres in length, what will the vertical drop distance be?
54mm
18mm
36mm
72mm
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the purpose of the component shown, when installed at the base of the stack?
To prevent evaporation
To prevent backflow
To prevent expansion
To prevent compression
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum recommended length of a discharge pipe from a bath connected to a primary ventilated stack?
3 metres
4 metres
5 metres
6 metres
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum recommended length of a discharge pipe from a WC connected to a primary ventilated stack?
3 metres
4 metres
5 metres
6 metres
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is the maximum recommended length of a discharge pipe from an appliance with 50mm waste pipe connected to a primary ventilated stack?
3 metres
4 metres
5 metres
6 metres
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports