Simtronics SPM-100 Tank System Process Quiz

Simtronics SPM-100 Tank System Process Quiz

11th Grade

43 Qs

quiz-placeholder

Similar activities

Quiz KD 3.6 SPESIFIKASI DRAINASE JALAN DAN JEMBATAN

Quiz KD 3.6 SPESIFIKASI DRAINASE JALAN DAN JEMBATAN

11th Grade

40 Qs

ASE Maintenance and Light Repair Full Review

ASE Maintenance and Light Repair Full Review

9th - 12th Grade

42 Qs

General Employment Spring Semester Review

General Employment Spring Semester Review

9th - 12th Grade

40 Qs

Simtronics SPM-100 Tank System Process Quiz

Simtronics SPM-100 Tank System Process Quiz

Assessment

Passage

Professional Development

11th Grade

Hard

Created by

Scott SANDVIK

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

43 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary objective of the SPM-100 Tank System Process?

To teach the fundamental principles of fluid flow and tank level control

To increase water pressure throughout the system

To purify water for drinking purposes

To monitor the quality of water in real-time

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many tanks are involved in the SPM-100 Tank System?

Two tanks

Three tanks

Four tanks

Five tanks

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What happens to the water in the SPM-100 Tank System?

It is recycled back to the supply system

It is heated and evaporated

It drains into a water sewer system after passing through the tanks

It is used for chemical testing

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Approximately how much water is moved through the tank system at ambient conditions?

10 GPM

25 GPM

50 GPM

100 GPM

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many water holdup tanks are described in the equipment specifications of the SPM-100 Manual Operator?

One

Two

Three

Four

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the total capacity of each holdup tank in the SPM-100 system?

22 ft³

167 gallons

100 GPM

1.5 minutes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which component modulates the water to the first tank in the SPM-100's water supply system?

Control valve (V-101)

Block valve (HV-101)

Control valve (V-102)

Control valve (V-104)

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?