SPP 206

SPP 206

12th Grade

15 Qs

quiz-placeholder

Similar activities

Ag Mech 2 - 4.05 (Part 2)

Ag Mech 2 - 4.05 (Part 2)

9th - 12th Grade

15 Qs

[10/15] Organizational Structure/IT App

[10/15] Organizational Structure/IT App

9th - 12th Grade

17 Qs

International Business

International Business

9th - 12th Grade

20 Qs

L3 Core 07

L3 Core 07

10th - 12th Grade

14 Qs

Senior Capstone Semester 1 Midterm

Senior Capstone Semester 1 Midterm

12th Grade

12 Qs

Engineering Design Process Quiz

Engineering Design Process Quiz

12th Grade

20 Qs

L3 YR1 Unit 301 session 5 Interdependencies between trades

L3 YR1 Unit 301 session 5 Interdependencies between trades

12th Grade

19 Qs

Core Electrical Module 5 - Construction Drawings

Core Electrical Module 5 - Construction Drawings

12th Grade

19 Qs

SPP 206

SPP 206

Assessment

Quiz

Other

12th Grade

Easy

Created by

Julianne Andres

Used 1+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the concept of Comprehensive Architectural Services?

Consultation services only

Basic and additional services

Limited services

Comprehensive range of professional services

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Who is the prime professional in Comprehensive Architectural Services?

Contractor

Engineer

Client

Architect

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does Project Management (PM) involve?

Construction services only

Management activities beyond architectural and engineering services

Only architectural services

Design services only

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the Pre-Design Services under Comprehensive Architectural Services?

Architectural Interiors, Acoustic Design

Building Testing and Commissioning, Building Appraisal

Consultation, Feasibility Studies

Site Development Planning, Security Evaluation and Planning

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How is the Project Manager (PM) compensated?

Hourly rate

Fixed salary

Percentage basis

Lump sum payment

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the primary responsibility of the Project Manager (PM)?

Client communication

Construction supervision

Cost control

Design development

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What are the Regular Design Services under Comprehensive Architectural Services?

Building Appraisal, Structural Conceptualization

Building Systems Design, Facilities Maintenance Support

Schematic Design Phase, Design Development Phase

Site Selection and Analysis, Architectural Programming

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?