Mock 4 Construction Industry

Mock 4 Construction Industry

10th Grade

14 Qs

quiz-placeholder

Similar activities

Production/Construction CUA House

Production/Construction CUA House

10th Grade

17 Qs

GCSE 2022 - Memory

GCSE 2022 - Memory

8th Grade - University

15 Qs

Construction: Basic Communication Skills

Construction: Basic Communication Skills

9th - 12th Grade

10 Qs

Career Paths

Career Paths

9th - 12th Grade

15 Qs

WJEC Construction job roles

WJEC Construction job roles

10th - 11th Grade

15 Qs

Driver Ed midterm 2

Driver Ed midterm 2

10th Grade - University

18 Qs

Digital/Media Literacy Check

Digital/Media Literacy Check

7th - 12th Grade

19 Qs

TLM Ingot

TLM Ingot

9th - 11th Grade

12 Qs

Mock 4 Construction Industry

Mock 4 Construction Industry

Assessment

Quiz

Other

10th Grade

Medium

Created by

Michael Robinson

Used 13+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The environmental benefit of the use of offsite construction is that it what?

It's only suitable for social housing

It reduces the amount of waste material

Increases site delivery

Increases building time

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Disposable of combustible must be appropriately stored to reduce the possibility of what?

A fire

Don't go out of date

So they don't get damp

They don't get lost

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is regarded as a sustainable construction material?

Granite

Soft wood

Concrete

Plastic

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How do knots in structure affect its strength

Decrease it's tensile strength

Decrease it's shear strength

increase it's shear strength

Increase it's tensile strength

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the disadvantage of using CAD to produce working drawings?

Secure storage of information

Initial costs

Use of sharing information

Retrieving information for later use

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What information is shown in drawings/specifications?

When site opening hours are

Site layout and fire assembly point

Where is the nearest hospital

What materials go in which floor area and sizes

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In relation to BIM what does clash detection refer to?

2 contractors on site at the same time

2 separate parts of a structure occupy the same space

Identification of trades that cannot work together

Different costings for the same work

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?