The reactor vessel internal component(s) that carries the entire weight of the core and other internals is/are the:

Systems Week 2 quiz

Quiz
•
Science
•
Professional Development
•
Hard
Jeff Weyhmiller
Used 1+ times
FREE Resource
10 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Core Support Lugs
Core Shrouds
Upper Guide Structure
Core Support Barrel
2.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
In the RVLMS indications, the top of the hot leg is between lights...
#3 and #4
#4 and #5
#5 and #6
#6 and #7
3.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The plant is at full power
A Loss of Offsite Power occurs
All equipment responds as expected
The Pressurizer level lowers to 34%
Subsequently, the Pressurizer level recovers to 40%. At that point, assuming NO operator action, which banks of Pressurizer heaters are energized?
Heaters powered from LCC-15 ONLY
No heaters are energized
Heaters powered from LCC-15 AND LCC-16
Heaters powered from LCC-16 ONLY
4.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
What is a consequence of energizing C-150A, Aux Hot Shutdown Panel, with SS-TAVE, Ave Temp Display Select, in the "LOOP 1 TAVE" position?
P-8B, Steam Drive Aux Feed Pump, receives a start signal
Atmospheric Steam Dump Valves get a quick open signal
PCS Loop 2B WR Tcold TI-0125C fails low on C-150A
Atmospheric Steam Dump Valves fail closed
5.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
At what temperature is LTOP required to be in service and what is the PORV pressure relief path?
<= 430°F
Quench Tank
<=430°F
Primary System Drain Tank
<=460°F
Primary System Drain Tank
<=460°F
Quench Tank
6.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
Which set of temperature readings represents a set of conditions where the reactor must be tripped?
Lower Seal = 170°F with no CCW cooling available
Two seal stages failed
P-50B vibrations = 20 mils
Upper Thrust Bearing = 180°F with no CCW cooling available
One seal stage failed
P-50B vibrations = 25 mils
Upper Guide Bearing = 180°F with no CCW cooling available
One seal stage failed
P-50B vibrations = 20 mils
Lower Guide Bearing = 180°F with no CCW cooling available
Two seal stage failed
P-50B vibrations = 25 mils
7.
MULTIPLE CHOICE QUESTION
15 mins • 1 pt
The plant is at full power
The VCT level is initially 55% and Charging Pump suction is in its normal lineup
During a transient, the VCT level lowers to 5% and then subsequently recovers to 25%
Assuming that all automatic actions occurred as expected, What is the current alignment of following valves that provide suction to the Charging Pumps?
MO-2087, VCT Outlet
MO-2160, SIRW Outlet
MO-2087 is open
MO-2160 is open
MO-2087 is closed
MO-2160 is open
MO-2087 is closed
MO-2160 is closed
MO-2087 is open
MO-2160 is closed
Create a free account and access millions of resources
Similar Resources on Quizizz
10 questions
ABA 102

Quiz
•
Professional Development
10 questions
1. Ôn tập VHCT- Quy định tác phong trang phục

Quiz
•
Professional Development
15 questions
Phase 4: Unit 303 Combustion 3

Quiz
•
Professional Development
10 questions
Load Sensing & Pressure Compensated

Quiz
•
Professional Development
12 questions
Biogeochemical Cycles

Quiz
•
University - Professi...
10 questions
Sosialisasi Buku Panduan

Quiz
•
University - Professi...
15 questions
Hot Water Systems Quiz L3P2U5,1.2

Quiz
•
Professional Development
14 questions
Acid Base Titration

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Multiplication Facts

Quiz
•
4th Grade
20 questions
Math Review - Grade 6

Quiz
•
6th Grade
20 questions
math review

Quiz
•
4th Grade
5 questions
capitalization in sentences

Quiz
•
5th - 8th Grade
10 questions
Juneteenth History and Significance

Interactive video
•
5th - 8th Grade
15 questions
Adding and Subtracting Fractions

Quiz
•
5th Grade
10 questions
R2H Day One Internship Expectation Review Guidelines

Quiz
•
Professional Development
12 questions
Dividing Fractions

Quiz
•
6th Grade