Systems Week 2 quiz

Systems Week 2 quiz

Professional Development

10 Qs

quiz-placeholder

Similar activities

Energy quiz

Energy quiz

6th Grade - Professional Development

7 Qs

Energy Save

Energy Save

Professional Development

8 Qs

PP 13 Central Heating System Quiz

PP 13 Central Heating System Quiz

Professional Development

10 Qs

Load Sensing & Pressure Compensated

Load Sensing & Pressure Compensated

Professional Development

10 Qs

Pumps

Pumps

Professional Development

6 Qs

Biogeochemical Cycles

Biogeochemical Cycles

University - Professional Development

12 Qs

Basic Anatomy

Basic Anatomy

Professional Development

10 Qs

The Circulatory System - SME

The Circulatory System - SME

Professional Development

10 Qs

Systems Week 2 quiz

Systems Week 2 quiz

Assessment

Quiz

Science

Professional Development

Hard

Created by

Jeff Weyhmiller

Used 1+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The reactor vessel internal component(s) that carries the entire weight of the core and other internals is/are the:

Core Support Lugs

Core Shrouds

Upper Guide Structure

Core Support Barrel

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

In the RVLMS indications, the top of the hot leg is between lights...

#3 and #4

#4 and #5

#5 and #6

#6 and #7

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The plant is at full power

A Loss of Offsite Power occurs

All equipment responds as expected

The Pressurizer level lowers to 34%

Subsequently, the Pressurizer level recovers to 40%. At that point, assuming NO operator action, which banks of Pressurizer heaters are energized?

Heaters powered from LCC-15 ONLY

No heaters are energized

Heaters powered from LCC-15 AND LCC-16

Heaters powered from LCC-16 ONLY

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is a consequence of energizing C-150A, Aux Hot Shutdown Panel, with SS-TAVE, Ave Temp Display Select, in the "LOOP 1 TAVE" position?

P-8B, Steam Drive Aux Feed Pump, receives a start signal

Atmospheric Steam Dump Valves get a quick open signal

PCS Loop 2B WR Tcold TI-0125C fails low on C-150A

Atmospheric Steam Dump Valves fail closed

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

At what temperature is LTOP required to be in service and what is the PORV pressure relief path?

<= 430°F

Quench Tank

<=430°F

Primary System Drain Tank

<=460°F

Primary System Drain Tank

<=460°F

Quench Tank

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which set of temperature readings represents a set of conditions where the reactor must be tripped?

Lower Seal = 170°F with no CCW cooling available

Two seal stages failed

P-50B vibrations = 20 mils

Upper Thrust Bearing = 180°F with no CCW cooling available

One seal stage failed

P-50B vibrations = 25 mils

Upper Guide Bearing = 180°F with no CCW cooling available

One seal stage failed

P-50B vibrations = 20 mils

Lower Guide Bearing = 180°F with no CCW cooling available

Two seal stage failed

P-50B vibrations = 25 mils

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

The plant is at full power

The VCT level is initially 55% and Charging Pump suction is in its normal lineup

During a transient, the VCT level lowers to 5% and then subsequently recovers to 25%

Assuming that all automatic actions occurred as expected, What is the current alignment of following valves that provide suction to the Charging Pumps?

MO-2087, VCT Outlet

MO-2160, SIRW Outlet

MO-2087 is open

MO-2160 is open

MO-2087 is closed

MO-2160 is open

MO-2087 is closed

MO-2160 is closed

MO-2087 is open

MO-2160 is closed

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?