III YEAR PSOC

III YEAR PSOC

University

15 Qs

quiz-placeholder

Similar activities

Pre Test (Group 1)

Pre Test (Group 1)

University

10 Qs

Ch. 13 Material Handling Safety

Ch. 13 Material Handling Safety

University

18 Qs

SGP Test 1

SGP Test 1

University

20 Qs

I-CLASS 6

I-CLASS 6

University

10 Qs

Limit state design of steel structure

Limit state design of steel structure

University - Professional Development

10 Qs

NCCER Mod 6:  Basic Rigging Vocab

NCCER Mod 6: Basic Rigging Vocab

9th Grade - University

20 Qs

Smart Grid

Smart Grid

University

15 Qs

EE8702_PSOC_MODEL II_PART B

EE8702_PSOC_MODEL II_PART B

University

15 Qs

III YEAR PSOC

III YEAR PSOC

Assessment

Quiz

Other

University

Hard

Created by

PRABHU R

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A power system has a maximum load of 15 MW. Annual load factor is 50%. The reserve capacity of plant is _____ if the plant capacity factor is 40%.

3.75 MW

7.75 MW

46.75 MW

8.75 MW

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The area under the load curve represents ____________

maximum demand

load factor

the average load on power system

number of units generated

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The ratio of maximum demand to connected load is

Demand factor

Load factor

Utilisation Factor

Plant capacity factor

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A higher load factor means

Cost/unit is less

Less variation in load

Generation is more

All of these

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Turbine speed governing system consists of

Flyball speed governor

Hydraulic amplifier and Linkage mechanism

Speed changer

All of above

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In a power plant, reserve generating capacity which is not in operation but can be made available for service is ______

Hot Reserve

Spinning Reserve

Cold Reserve

Firm power

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Time constant of turbine is lies between

0.2 to 2.5 sec

0 to 1 sec

1 to 2 sec

Depends on turbine design

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?