Project Master

Project Master

Professional Development

50 Qs

quiz-placeholder

Similar activities

PRETEST KPPS 2024 DESA CILIMUS

PRETEST KPPS 2024 DESA CILIMUS

Professional Development

50 Qs

APP PART 1

APP PART 1

Professional Development

55 Qs

Road to Fame

Road to Fame

Professional Development

50 Qs

Top 50 Brand/Generic Drug 2019

Top 50 Brand/Generic Drug 2019

12th Grade - Professional Development

54 Qs

 Art Appreciation

Art Appreciation

Professional Development

53 Qs

INTERNS A BATCH

INTERNS A BATCH

Professional Development

50 Qs

AI Prompt Engineering Level 1 Certification Exam

AI Prompt Engineering Level 1 Certification Exam

Professional Development

50 Qs

FO-Concierge SOPs

FO-Concierge SOPs

Professional Development

49 Qs

Project Master

Project Master

Assessment

Quiz

Specialty

Professional Development

Practice Problem

Hard

Created by

Joanna D.

Used 1+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

50 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

You are project manager of a project. During the process of selecting the sellers, you reject one vendor because it doesn't have the manufacturing capability. This is an example of which selection tool?

Weighting system
Screening system
Seller rating system
Expert judgment

2.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What provides details about how the project scope may be changed?

Control Scope system
VeiirV Scope
Scope Charter
Scope Management plan

3.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following technique to identify the underlying cause of a problem and take steps to prevent further occurrence?

Root cause analysis
Quality audits
Project audits
Risk audits

4.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Which of the following provides the least accurate in estimating?

Rough order of magnitude
Budget estimate
WBS estimate
Definitive estimate

5.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Who has the responsibility for informing the final deliverable to all stakeholders?

Project Manager
Sponsor
Team Lead
Management

6.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

What is a corrective action?

An action that brings future project events Into alignment with the project plan
An action to correct something in the project
An action to prevent something in the project
Corrective action is not related to project

7.

MULTIPLE CHOICE QUESTION

2 mins • 1 pt

Assumptions are factors that, for planning purposes, are considered to be …

True, real, or certain
True, real, or uncertain
Real
Verbal

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?