Sanitary Pipework Systems Quiz

Sanitary Pipework Systems Quiz

Professional Development

36 Qs

quiz-placeholder

Similar activities

Phase 2 306 Hot Water checkpoint quiz

Phase 2 306 Hot Water checkpoint quiz

Professional Development

40 Qs

Suzuki Ciaz  - Assessment

Suzuki Ciaz - Assessment

Professional Development

33 Qs

PGF.04-AU54.2022.czerwiec z komentarzem

PGF.04-AU54.2022.czerwiec z komentarzem

Professional Development

40 Qs

Quiz_Egzamin_a54_2019_czerwiec_Janiszewski_Bartosz

Quiz_Egzamin_a54_2019_czerwiec_Janiszewski_Bartosz

Professional Development

40 Qs

Heating Systems Quiz

Heating Systems Quiz

Professional Development

37 Qs

Hot water 40 questions version 1 AR

Hot water 40 questions version 1 AR

Professional Development

40 Qs

Progression revision 6

Progression revision 6

Professional Development

34 Qs

Progression revision 5

Progression revision 5

Professional Development

34 Qs

Sanitary Pipework Systems Quiz

Sanitary Pipework Systems Quiz

Assessment

Quiz

Other

Professional Development

Hard

Created by

Andy Roper

FREE Resource

36 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The design of sanitary pipework systems is covered in

the Building Regulations

British Standard 6700

the Water Regulations

the Construction Regulations.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

Refer to Figure 1. The gutter cross-section shown is

half round

Ogee

Victorian

Square.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The maximum recommended length of a 40 mm waste discharge pipe from a sink when connected to a Primary Ventilated Stack System is

1 m

1.5 m

2 m

3 m.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The final electrical connection to a WC macerator installation should be wired from

an un-switched fused spur outlet

the mains board consumer unit

a switched fused spur outlet

a pull switch in the WC compartment.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A new discharge stack is to be connected to an existing drain, on commencing the work the underground pipework is found to be blocked. The plumbing contractor should

get the appropriate tools and clear the drain

tell the customer and agree next actions

contact the Environmental Health Department.

contact the Local Authority Drainage Department.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which one of the following is most likely to be used when positioning gutter brackets?

Expansion bit.

Water gauge.

Plumb line.

String line.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The minimum diameter for a waste pipe from a washing machine to a gulley is

22 mm

28 mm

32 mm

40 mm.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?