1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following statement is NOT integration point between module PP and FICO?

Activity cost calculation

Asset/Sub-Asset numbering in Master Data

Product costing calculation

Production cost variance calculation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activity under Process Order execution?

Process Order Creation

Process Order Settlement

Order Confirmations

Process Order Release

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following data is NOT INPUT/OUTPUT of MRP Process?

Planned Independent Requirement

Planned Order

PR

Process Order

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statement is NOT integration point between module QM and other module?

Inspection when equipment is repaired

Goods receipt inspection after production is finished

In-coming goods receipt inspection

Inspection when customer return

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the CORRECT sequence of quality inspection process?

Result Recording >> Usage Decision >> Inspection Lot creation

Inspection Lot creation >> Usage Decision >> Result Recording

Inspection Lot creation >> Result Recording >> Usage Decision

Usage Decision >> Inspection Lot creation >> Result Recording

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statement is NOT TRUE about PM process?

Corrective Maintenance is a maintenance tasks performed after the a malfunction or failure of a machine

Maintenance Notification is the maintenance request document describes the machine malfunction

Maintenance Order is the maintenance request document describes the machine malfunction

The objective of preventive maintenance is to prevent the system or machine from a breakdown

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which Stock Type NOT applicable in SAP Inventory management?

Blocked stock: Un-used Stock

Consignment (vendor): Supplier’s Stock in Company premise

Quality inspection (QI): Stock waiting for inspection process

Unrestricted-use (UR): Stock ready for use or sale

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?