PPQMPMMMWM Overview

PPQMPMMMWM Overview

Professional Development

9 Qs

quiz-placeholder

Similar activities

language class 5

language class 5

9th Grade - Professional Development

10 Qs

Are we running out of things?

Are we running out of things?

Professional Development

11 Qs

Money, Money, Money

Money, Money, Money

Professional Development

10 Qs

Future time

Future time

Professional Development

14 Qs

Types of Reports

Types of Reports

Professional Development

12 Qs

MATURA ENGLISH: Globalization and Its Impacts on the Work World

MATURA ENGLISH: Globalization and Its Impacts on the Work World

Professional Development

10 Qs

Inside an airport terminal

Inside an airport terminal

Professional Development

10 Qs

ENGLISH FOR BUSINESS STUDIES

ENGLISH FOR BUSINESS STUDIES

University - Professional Development

10 Qs

PPQMPMMMWM Overview

PPQMPMMMWM Overview

Assessment

Quiz

English

Professional Development

Medium

Created by

K G

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Which of the following statement is NOT integration point between module PP and FICO?

Activity cost calculation

Asset/Sub-Asset numbering in Master Data

Product costing calculation

Production cost variance calculation

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activity under Process Order execution?

Process Order Creation

Process Order Settlement

Order Confirmations

Process Order Release

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following data is NOT INPUT/OUTPUT of MRP Process?

Planned Independent Requirement

Planned Order

PR

Process Order

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statement is NOT integration point between module QM and other module?

Inspection when equipment is repaired

Goods receipt inspection after production is finished

In-coming goods receipt inspection

Inspection when customer return

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is the CORRECT sequence of quality inspection process?

Result Recording >> Usage Decision >> Inspection Lot creation

Inspection Lot creation >> Usage Decision >> Result Recording

Inspection Lot creation >> Result Recording >> Usage Decision

Usage Decision >> Inspection Lot creation >> Result Recording

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following statement is NOT TRUE about PM process?

Corrective Maintenance is a maintenance tasks performed after the a malfunction or failure of a machine

Maintenance Notification is the maintenance request document describes the machine malfunction

Maintenance Order is the maintenance request document describes the machine malfunction

The objective of preventive maintenance is to prevent the system or machine from a breakdown

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which Stock Type NOT applicable in SAP Inventory management?

Blocked stock: Un-used Stock

Consignment (vendor): Supplier’s Stock in Company premise

Quality inspection (QI): Stock waiting for inspection process

Unrestricted-use (UR): Stock ready for use or sale

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which is CORRECT SEQUENCE Physical Inventory Count Process?

  1. 1. Enter Count Quantity

  2. 2. Post difference for adjustment

  3. 3. Create Physical Inventory Doc

  1. 1. Create Physical Inventory Doc

  2. 2. Post difference for adjustment

  3. 3. Enter Count Quantity

1. Post difference for adjustment

2. Enter Count Quantity 3. Create Physical Inventory Doc

1.Create Physical Inventory Doc

2. Enter Count Quantity 3. Post difference for adjustment

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is NOT the enterprise structure of WM?

Storage Type

Order type

Storage Section

Storage Bins