Agile Methodology Quiz

Agile Methodology Quiz

University

20 Qs

quiz-placeholder

Similar activities

2°Z_AV2_R2 2TEC_APS_Conceitos de Scrum_7_14_Quizizz

2°Z_AV2_R2 2TEC_APS_Conceitos de Scrum_7_14_Quizizz

11th Grade - University

16 Qs

Practica

Practica

University

19 Qs

TIC III - TEST #3

TIC III - TEST #3

University

21 Qs

Chapter 1

Chapter 1

University

15 Qs

Kennis over Scrum

Kennis over Scrum

12th Grade - University

20 Qs

SOFTWARE REQUIREMENT AND DESIGN

SOFTWARE REQUIREMENT AND DESIGN

University

20 Qs

Chapter 2-Software Process Model

Chapter 2-Software Process Model

University

20 Qs

PF101 - Pretest 7

PF101 - Pretest 7

University

20 Qs

Agile Methodology Quiz

Agile Methodology Quiz

Assessment

Quiz

Computers

University

Medium

Created by

Shivam Singh

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following consists of the rapid explanation of all the functionalities desired in the product?

User manual

HLD (High-Level Design)

Product backlog

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

In Agile, what is the recommended size for a cross-functional Scrum Team?

It can vary, but the team should be small enough to remain nimble.

5-7 members

8-10 members

4-5 members

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When is a Sprint Retrospective ceremony performed?

End of each Sprint

Before Sprint review Ceremony

Not Mandatory

None of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following options is used to measure the size of a user story for an Agile Project?

Story points

Function points

Velocity points

Work breakdown points

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which chart depicts the amount of work done in the project?

Burn-down

Burn-up

Both A and B

None of the above

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following is the working culture of an Agile team?

Connective

Collaborative

Contemplative

None of the above

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following activity is not timeboxed?

Sprint Retrospective meeting

Sprint

Product Backlog Refinement

Daily Scrum

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?