PP 11 Central Heating System Quiz

PP 11 Central Heating System Quiz

Professional Development

10 Qs

quiz-placeholder

Similar activities

Volcanic eruption

Volcanic eruption

University - Professional Development

10 Qs

Chapter 2 - Suppository & Pessary

Chapter 2 - Suppository & Pessary

University - Professional Development

15 Qs

Pharmaceutical Industry In era of VUCA

Pharmaceutical Industry In era of VUCA

Professional Development

10 Qs

Introduction to Practical Food Hygiene

Introduction to Practical Food Hygiene

Professional Development

10 Qs

CNE- Hepatobiliary Workshop

CNE- Hepatobiliary Workshop

Professional Development

15 Qs

CTI Quiz Bee 2021 | Average Round

CTI Quiz Bee 2021 | Average Round

Professional Development

10 Qs

Changes around us

Changes around us

KG - Professional Development

7 Qs

Soil CBSE Grade 7

Soil CBSE Grade 7

7th Grade - Professional Development

10 Qs

PP 11 Central Heating System Quiz

PP 11 Central Heating System Quiz

Assessment

Quiz

Science

Professional Development

Practice Problem

Medium

Created by

jon May

Used 14+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended test duration according to BS14336?

3 hours

2 hours

1 hour

4 hours

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the system test pressure for a sealed system with an operating pressure of 1 bar?

0.5 bar

1 bar

2 bar

1.5 bar

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of cold flushing a central heating system?

To remove excess flux

To remove debris from the installation process

To remove excess jointing compounds

To remove hydrogen from the system

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the process of releasing trapped air or hydrogen from the top of a radiator called?

Balancing

Bleeding

Flushing

Filling

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What should be done before working on any electrical component, including the boiler?

Lock off the fuse holder ( safe isolation )

Remove the fuse from the boiler

Switch off the central heating system

Switch off the boiler

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of balancing the system when the system is commissioned?

To switch off the central heating system

To remove hydrogen from the system

To remove debris from the installation process

To ensure uniform heating of radiators

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the recommended temperature difference between the flow and return pipework when the system is warm?

10ºC

9ºC

8ºC

11ºC

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?