
6035 | Central Heating LO1 Part 3
Authored by George Harding
Professional Development
Professional Development
Used 127+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
11 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The Building Regulations that cover heat producing appliances?
Part A
Part L
Part G
Part J
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Select the correct option from the description given: Before installing, the incoming pressure and flow rates in the property needs to be checked.
Combination boiler
Convectional boiler
System boiler
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Statement: LPG fired boilers are supplied from the national grid, along with natural gas and electricity.
True
False
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To be fitted, condensing boilers must be:
LPG fired
Electrically supplied
SEDBUK rated A
Part P compliant
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
If a system is open vented, what type of boiler is required?
Conventional boiler
Combination boiler
System boiler
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The symbol shown here is?
Double check valve
Single check valve
Radiator valve
Gate valve
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The boiler that used two heat exchangers to heat up the system?
Traditional boilers
Condensing boilers
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?