List two gases used for heat producing equipment used in the plumbing industry.

GMJ 7202 copper pipe MCQ

Quiz
•
Other
•
Professional Development
•
Easy
Glen Johnson
Used 37+ times
FREE Resource
20 questions
Show all answers
1.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
Methane
Propane
Oxygen
Mapp
2.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
State how gases used for heat producing equipment should be transported and stored. (select 4 answers)
Upright
Outside
Inside
Well ventilated
Secure
3.
MULTIPLE SELECT QUESTION
45 sec • 1 pt
List the requirements for visual inspection of heat producing equipment ( blow torches etc).
Check for no damage to the regulator by inspecting the thread
Check for no damage/splits to the hose
Check for no damage to the blow torch - loose or wobbly/unsecure/bits missing etc
Check the gas smells like the right gas
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When assembling heat producing equipment - what is the first thing we do?
Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.
Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder
Tighten firmly with a spanner anti-clockwise as it is a left hand thread
Insert regulator in to ON/OFF valve and tighten
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When assembling heat producing equipment - what is the second thing we do?
Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.
Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder
Tighten firmly with a spanner anti-clockwise as it is a left hand thread
Insert regulator in to ON/OFF valve and tighten
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When assembling heat producing equipment - what is the third thing we do?
Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.
Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder
Tighten firmly with a spanner anti-clockwise as it is a left hand thread
Insert regulator in to ON/OFF valve and tighten
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When assembling heat producing equipment - what is the last thing we do?
Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.
Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder
Tighten firmly with a spanner anti-clockwise as it is a left hand thread
Insert regulator in to ON/OFF valve and tighten
Create a free account and access millions of resources
Similar Resources on Quizizz
15 questions
Domestic hot water systems

Quiz
•
12th Grade - Professi...
20 questions
L3 YR2 Revision 3 (Cold 3)

Quiz
•
Professional Development
15 questions
8202 Level 3 Drainage 2

Quiz
•
Professional Development
20 questions
Phase 2 revision 2

Quiz
•
Professional Development
15 questions
CPL Acft Tech -Fuel injection, Super/Turbocharging, Exhaust

Quiz
•
Professional Development
20 questions
WCS 1106-3 - Knowledge Assessment

Quiz
•
Professional Development
16 questions
Turbo Components and Operation

Quiz
•
Professional Development
15 questions
Ora07-003

Quiz
•
Professional Development
Popular Resources on Quizizz
15 questions
Character Analysis

Quiz
•
4th Grade
17 questions
Chapter 12 - Doing the Right Thing

Quiz
•
9th - 12th Grade
10 questions
American Flag

Quiz
•
1st - 2nd Grade
20 questions
Reading Comprehension

Quiz
•
5th Grade
30 questions
Linear Inequalities

Quiz
•
9th - 12th Grade
20 questions
Types of Credit

Quiz
•
9th - 12th Grade
18 questions
Full S.T.E.A.M. Ahead Summer Academy Pre-Test 24-25

Quiz
•
5th Grade
14 questions
Misplaced and Dangling Modifiers

Quiz
•
6th - 8th Grade