GMJ 7202 copper pipe MCQ

GMJ 7202 copper pipe MCQ

Professional Development

20 Qs

quiz-placeholder

Similar activities

L3 YR2 Revision 2 (Hot)

L3 YR2 Revision 2 (Hot)

Professional Development

24 Qs

2018 IPC CH 6A Quiz

2018 IPC CH 6A Quiz

Professional Development

25 Qs

2018 IPC CH 7B Study Quiz

2018 IPC CH 7B Study Quiz

Professional Development

25 Qs

OSHA 18 Question Quiz

OSHA 18 Question Quiz

Professional Development

18 Qs

Level 2 Code Questions

Level 2 Code Questions

Professional Development

20 Qs

Central Heating L2 6035 Plumbing

Central Heating L2 6035 Plumbing

Professional Development

20 Qs

BASICS OF BOILERS

BASICS OF BOILERS

Professional Development

15 Qs

2018 Mechanical Chapter 13

2018 Mechanical Chapter 13

Professional Development

25 Qs

GMJ 7202 copper pipe MCQ

GMJ 7202 copper pipe MCQ

Assessment

Quiz

Other

Professional Development

Easy

Created by

Glen Johnson

Used 37+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List two gases used for heat producing equipment used in the plumbing industry.

Methane

Propane

Oxygen

Mapp

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

State how gases used for heat producing equipment should be transported and stored. (select 4 answers)

Upright

Outside

Inside

Well ventilated

Secure

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

List the requirements for visual inspection of heat producing equipment ( blow torches etc).

Check for no damage to the regulator by inspecting the thread

Check for no damage/splits to the hose

Check for no damage to the blow torch - loose or wobbly/unsecure/bits missing etc

Check the gas smells like the right gas

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the first thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the second thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the third thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When assembling heat producing equipment - what is the last thing we do?

Turn on main ON/OFF valve and test for leak using leak detection fluid on all joints.

Remove dust cap and make visual inspection of the main ON/OFF valve on the cylinder

Tighten firmly with a spanner anti-clockwise as it is a left hand thread

Insert regulator in to ON/OFF valve and tighten

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?