Blocklaying Activities Quiz
Authored by Roy Douglas
Architecture
Professional Development
Used 4+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The abbreviation BLK stands for:
brickwork
blockwork
building
boardwalk
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Technical details on a working drawing can be located in the:
specification
bill of quantities
contract
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
One square metre of blockwork contains:
50 blocks
10 blocks
70 blocks
80 blocks
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Quarter blocks are inserted to maintain:
the joints
the face
the ranging
the bond
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
When is a bricklayer required to wear PPE?
Never
Always
Important events
Now and again
6.
MULTIPLE SELECT QUESTION
30 sec • 1 pt
In order to build even levelled courses the wall must be:
gauged
staged
caged
coursed
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Bricklayers use dry bonding to:
establish the joints
establish the face
establish the correct bond
establish the ranging
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?