Software Engineering Fundamentals

Software Engineering Fundamentals

University

14 Qs

quiz-placeholder

Similar activities

Quiz 02- Software Engineering

Quiz 02- Software Engineering

University

19 Qs

Reading Facilitation

Reading Facilitation

University

10 Qs

TMM QUIZIZZ Bersama SMK 5 Balikpapan

TMM QUIZIZZ Bersama SMK 5 Balikpapan

University

14 Qs

Quiz 01 - Software Engineering

Quiz 01 - Software Engineering

University

15 Qs

Instructional Design Model

Instructional Design Model

University

10 Qs

Web authoring testing ecommerce article

Web authoring testing ecommerce article

University

13 Qs

CURRICULUM STUDIES QUIZ 2

CURRICULUM STUDIES QUIZ 2

University - Professional Development

15 Qs

DFP40182 CHAPTER 1-1.2

DFP40182 CHAPTER 1-1.2

University - Professional Development

10 Qs

Software Engineering Fundamentals

Software Engineering Fundamentals

Assessment

Quiz

Education

University

Medium

Created by

Manish Manish

Used 6+ times

FREE Resource

14 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Software Development Model selection is based on _________

Requirements

Development team & users

Project type & associated risk

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the study of an existing system refer to?

Details of DFD

Feasibility Study

System Analysis

System Planning

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The major drawback of RAD model is __________.

It requires highly skilled developers/designers.

It necessitates customer feedbacks.

It increases the component reusability.

Both (a) & (c)

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following options is correct?

The prototyping model facilitates the reusability of components.

RAD Model facilitates reusability of components

Both RAD & Prototyping Model facilitates reusability of components

None

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following models doesn't necessitate defining requirements at the earliest in the lifecycle?

RAD & Waterfall

Spiral & Prototyping

Prototyping & Waterfall

Spiral & RAD

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When the user participation isn't involved, which of the following models will not result in the desired output?

Prototyping & Waterfall

Prototyping & Spiral

Prototyping & RAD

RAD & Spiral

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which model will be preferred by a company that is planning to deploy an advanced version of an existing s/w in the mkt?

Spiral

Iterative Enhancement

RAD

Both Iterative Enhancement & RAD

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?