1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A(n) ___ is used for monitoring or changing system variables, making control decisions, and interfacing with other types of systems.
relay
actuator
temperature sensor
control device
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Human-machine interfaces are either hardware-based or ___-based.
open-loop
closed-loop
software
derivative
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A control point is a(n) ___ in a control system.
constant
center point
virtual point
actual value
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
In a(n) ___ control system, decisions are made based only on the current state of the system and a model of how it should work.
open-loop
closed-loop
HVAC
proportional
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
___ is the adjustment of control parameters for the desired control response.
Virtual variables
Tweaking
Tuning
Realigning
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A(n) ___ is a sequence of instructions for producing the optimal result to a problem.
building automation system
protocol
relay
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
____ is especially used in commercial buildings that have a large number of electric baseboard heaters or small exhaust fans.
Optimum start/stop control
Life safety control
Temporary scheduling
Duty cycling
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?