Unit 7 Test

Unit 7 Test

Professional Development

34 Qs

quiz-placeholder

Similar activities

Quiz Set 2

Quiz Set 2

Professional Development

30 Qs

Lighting 2

Lighting 2

Professional Development

38 Qs

BP344 Quiz

BP344 Quiz

Professional Development

30 Qs

Integrative Strategies | LEED Green Associate

Integrative Strategies | LEED Green Associate

Professional Development

36 Qs

Professional Practice [Quiz No. 2]

Professional Practice [Quiz No. 2]

Professional Development

30 Qs

Sustainable Sites | LEED Green Associate

Sustainable Sites | LEED Green Associate

Professional Development

34 Qs

Le BIM

Le BIM

Professional Development

29 Qs

Methods of Compensation March 12, 2021

Methods of Compensation March 12, 2021

University - Professional Development

39 Qs

Unit 7 Test

Unit 7 Test

Assessment

Quiz

Architecture

Professional Development

Medium

Created by

Umair Syed

Used 2+ times

FREE Resource

34 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

The development of a new office block would be classified as:

Residential construction

Infrastructure construction

Industrial construction

Commercial construction

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

In what location would a DPM be installed in a building?

Wall

Floor

Roof

Window

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following is a potential disadvantage of using a steel frame system?

Strength to weight ratio

Installation time

Fire protection

Flexibility of design

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following is not an element of the substructure?

Retaining walls

Lintels

Basements

Foundations

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

From the list below, which would not be a factor to be considered when selecting a foundation type?

Soil type

Ground conditions

Local wildlife

Location of drains and trees

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

Which type of foundation is shown in the image below?

Pad

Stepped

Raft

Pile

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which component of a cavity wall connects the inner and outer leaf?

Wall toggle

Wall tie

Wall connector

Mortar fixing

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?