SAMPLE 4 ALE 2018

SAMPLE 4 ALE 2018

Professional Development

30 Qs

quiz-placeholder

Similar activities

Rule 7 & 8 (1)

Rule 7 & 8 (1)

Professional Development

25 Qs

Fire Code Quiz

Fire Code Quiz

Professional Development

30 Qs

2.2 BM: WOOD

2.2 BM: WOOD

Professional Development

25 Qs

ALE BOARD PREP 3

ALE BOARD PREP 3

Professional Development

35 Qs

Building Laws Quiz 5 & 6- BP220 & PD 957

Building Laws Quiz 5 & 6- BP220 & PD 957

KG - Professional Development

25 Qs

ALE PD 1096

ALE PD 1096

Professional Development

25 Qs

ALE HOA 1

ALE HOA 1

Professional Development

25 Qs

PD 957

PD 957

Professional Development

25 Qs

SAMPLE 4 ALE 2018

SAMPLE 4 ALE 2018

Assessment

Quiz

Architecture

Professional Development

Medium

Used 274+ times

FREE Resource

30 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

The contractor has the right to terminate the contract or suspend work if there is suspension of work for ___ days through no fault of the contractor.

90 days

30 days

60 days

120 days

2.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

You had a residential project for a Client. After the construction, you found out that the Client used your design for another project without your consent. What will you do?

Inform the Mayor

File a case with the PRC

File a case in court

Forgive and forget.

3.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

This area of practice recommends the systematic process of ensuring that a building/structure's array of systems is planned, designed, installed and tested to perform according to the design intent and the building's operational needs.

Building Systems Design

Building Testing and Commissioning

Facilities Maintenance Support

Security Evaluation and Planning

4.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

A roman house with a central patio.

Atrium House

Thalamus

Domus

Villa

5.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

That part of the building foundation which forms the permanent

retaining wall of the structure below grade is a

foundation course

grade beam

foundation wall

6.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

A system of framing a building in which the studs are continuous to roof supporting second floor joints is known as

post and beam

western framing

space framing

balloon framing

7.

MULTIPLE CHOICE QUESTION

5 sec • 1 pt

Rough plaster finish obtained by flinging plaster on a wall with a hand operated machine is

tryolean finish

trowel finish

broom stripped finish

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?