
Chapter 9: Footings & Foundations - Know and Understand
Authored by AJ Adame
Design
12th Grade
Used 3+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
30 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Grading may be needed before building lines are laid out.
True
False
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
It is best to locate building lines with a builder’s level, transit, or _____.
autolevel
laser level
theodolite
total station
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A residence may need as much as 8′ to _____ of clearance for batter boards.
10
4
3
15
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Building sites on steep slopes or rugged terrain should be rough-graded before the building is laid out.
true
false
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
The highest point on the perimeter of an excavation is known as the _____.
grade level
control point
grade point
building line
6.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
IRC now allows frost-protected shallow foundations that are only _____″ below grade.
IRC now allows frost-protected shallow foundations that are only _____″ below grade.
6
12
16
36
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A _____ footing is one that changes grade levels at intervals to accommodate a sloping lot.
spread
plain
reinforced
stepped
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?