1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is Commissioning?
Inspection before construction is done.
Testing a system that already integrated to meet project specification requirement.
A delicious food from Jogjakarta
2.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Before commissioning phase, what is phase that must be passed?
Loop test
Field inspection test
Pre-comm
3.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is pre commissioning activity?
inspection and examinations of the equipment, devices, to make sure they are installed and working properly according to the specification
Calibration field instrument
Function acceptance test
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
Which one below is the correct one for sequence of fire and gas panel test?
Measure to confirm the incoming supply for F&G panel is 24 VDC
Visual Inspection of Fire and Gas Panel to ensure that the components are in normal condition after installation.
A and B are correct
5.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
What is HSE stand for?
Health safety and environment
High sensitive environment
High safety environment
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?