ENG4216-A

ENG4216-A

University

12 Qs

quiz-placeholder

Similar activities

Fundamental Rights

Fundamental Rights

6th Grade - University

10 Qs

Civil Engineering Material Chapter 1 & 2

Civil Engineering Material Chapter 1 & 2

University

10 Qs

LESSON UNITS 1-2-3**

LESSON UNITS 1-2-3**

University

10 Qs

SITASI - MD 1C

SITASI - MD 1C

University

10 Qs

Maya Angelou

Maya Angelou

2nd Grade - Professional Development

10 Qs

National Education Policy.

National Education Policy.

University

10 Qs

KUIS PKKMB IBLAM DAY 1

KUIS PKKMB IBLAM DAY 1

University

15 Qs

THE LEGAL BASIS OF THE PHRASE "I LOVE ANIMALS"

THE LEGAL BASIS OF THE PHRASE "I LOVE ANIMALS"

University

10 Qs

ENG4216-A

ENG4216-A

Assessment

Quiz

Education

University

Practice Problem

Hard

Created by

Dave Alviz

Used 2+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

12 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Lock out / tag out is the procedure __________________________________

To carry out maintenance jobs safely

To keep the machines in lock forever

To put tags with names of machine parts

To get permission for maintenance job

2.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Which of the following is NOT a hazard in working with a high voltage electrical transformer? 

rotating machine

corona effect

oil leakage

high voltage

3.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Before doing maintenance work, what preparations you must do in case of fire or emergency?

Locate nearest bathroom

Locate the nearest first aid, fire exit and firefighting equipment

Locate nearest mall

Locate nearest cafeteria

4.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

A work permit is a document used to _____________. 

Take permission to start any maintenance work

Estimate the cost of any maintenance

Describe the skills of the technicians doing maintenance work

Ensure the availability of spare parts needed for maintenance

5.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

In performing DC winding resistance test, a measured value of resistance equal to zero (0) ohms, means _____________.

shorted winding

open winding

good winding

none of the choices

6.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Media Image

In performing an insulation resistance test between the winding and core of a dry-type transformer, a reading of less than 1mega-ohm insulation resistance would mean _______. 

not good insulation between winding and core

good insulation between winding and core

there is water inside transformer core

none of the choices

7.

MULTIPLE CHOICE QUESTION

5 mins • 1 pt

Insulation resistance in the transformer may vary due to ________________. It is a must to monitor it while conducting an insulation resistance testing.

oil temperature

oil price

oil density

none of the choices

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?