Construction Industry Quiz

Construction Industry Quiz

Professional Development

8 Qs

quiz-placeholder

Similar activities

Importing and Exporting - Module 4:  Plan and Prepar for Export

Importing and Exporting - Module 4: Plan and Prepar for Export

Professional Development

10 Qs

Technical Analysis Day 5  - MACD

Technical Analysis Day 5 - MACD

11th Grade - Professional Development

10 Qs

Market Structures

Market Structures

University - Professional Development

10 Qs

Encontro 14: Periféricos de Computadores Pessoais

Encontro 14: Periféricos de Computadores Pessoais

Professional Development

12 Qs

UPS QUIZ

UPS QUIZ

Professional Development

10 Qs

Operational Risk Management Questionnaire

Operational Risk Management Questionnaire

Professional Development

10 Qs

ESOL Business

ESOL Business

Professional Development

10 Qs

UD BKK Material Supply and OTD Management

UD BKK Material Supply and OTD Management

Professional Development

10 Qs

Construction Industry Quiz

Construction Industry Quiz

Assessment

Quiz

Business

Professional Development

Medium

Created by

Daniel Edwards

Used 1+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the civil engineer in a construction project?

Sourcing and purchasing materials

Designing roads, bridges, and tunnels

Ensuring health and safety on site

Planning an efficient method of using resources

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the responsibility of the building contractor's estimator?

Ensuring health and safety on site

Sourcing and purchasing materials

Designing roads, bridges, and tunnels

Breaking down the bill of quantities into labor, plant, and materials

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the buyer in a construction project?

Ensuring health and safety on site

Sourcing and purchasing materials

Planning an efficient method of using resources

Breaking down the bill of quantities into labor, plant, and materials

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the responsibility of the planning engineer in a construction project?

Planning an efficient method of using resources

Sourcing and purchasing materials

Designing roads, bridges, and tunnels

Ensuring health and safety on site

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the role of the health and safety manager in a construction project?

Breaking down the bill of quantities into labor, plant, and materials

Sourcing and purchasing materials

Ensuring health and safety on site

Planning an efficient method of using resources

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the building contractor do based on the architect's drawings and the quantity surveyor's bill of quantities?

Construct the building

Source and purchase materials

Plan an efficient method of using resources

Design roads, bridges, and tunnels

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the estimator add to the bill of quantities for the building contractor?

Office staff and administration costs

Plant and materials

Labor and materials

Profit and overheads

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the responsibility of the safety officer in a construction project?

Planning an efficient method of using resources

Designing roads, bridges, and tunnels

Sourcing and purchasing materials

Administer safety inspections