Unit 38 Review Question

Unit 38 Review Question

University

24 Qs

Similar activities

Physics Energy Review Rachael

Physics Energy Review Rachael

8th Grade - University

20 Qs

Mechanical Energy Test Review

Mechanical Energy Test Review

8th Grade - University

20 Qs

Module 5 Mechanical Energy Test Review

Module 5 Mechanical Energy Test Review

8th Grade - University

20 Qs

Unit 1 Quiz

Unit 1 Quiz

University

25 Qs

Refrigerants review  Quiz

Refrigerants review Quiz

University

24 Qs

Braking system

Braking system

University

20 Qs

Quiz 17: The Solar System

Quiz 17: The Solar System

University

20 Qs

Basics of Thermodynamic Air cycles

Basics of Thermodynamic Air cycles

University

20 Qs

Unit 38 Review Question

Unit 38 Review Question

Assessment

Quiz

Created by

JohnnyGamers Lopez

Physics

University

1 plays

Easy

24 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A float switch, located in an auxiliary drain pan, is typically wired to

open the line voltage circuit to the air handler

cycle both the evaporator and condenser fans.

open the low-voltage control circuit.

control a condensate pump.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Two common methods for preventing the vibration of a package system from being transferred to the building or structure are

canvas connectors and duct insulation

using fiberglass ductboard and flex duct

rubber and cork pads and spring isolators

a roof curb and rigging holes

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Flexible duct used at the end of a metal duct run will

cause excessive friction losses

cause the duct to collapse and reduce its inner diameter

help reduce noise transmission in the ducts

greatly reduce airflow and should be avoided

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Square duct or rectangular duct is assembled with

"S" fasteners and drive clips

mastic and drive clips

foil tape and mastic

"S" fasteners and zip ties

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On a line set used to install a split-system, the ______ line is insulated.


liquid

compressor discharge

suction

smaller

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When installing the condensing unit of a split-system, it should be

set on a concrete or high-impact plastic pad

located out of sight, such as under a deck

lifted off the ground 24 in. to 48 in

located near a municipal water source for cleaning

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The applied voltage (the voltage that the unit will actually be using) should be within ±_____% of the rated voltage of the unit.


3

5

10

15

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Before a newly installed system is started up, it is recommended that

the service valves are returned to their closed position

the crankcase heater be allowed to operate for a specified period of time

the condenser be cleaned with a foaming cleanser

the factory Schrader pins be replaced with new ones

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When joining two sections of fiberglass ductboard

glue or spot welds are used

staples and tape are used

"S" fasteners and drive clips are used

a minimum of three screws should be used

10.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The __________ provides installation standards, wire sizes, methods of routing wires, and types of enclosures for wiring and disconnects.

National Fire Protection Association (NFPA)

International Fuel Gas Code (IFGC)

National Electrical Code (NEC)

U.S. Department of Energy (DOE)

Explore all questions with a free account

or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?