8710 unit 6 MCQ

8710 unit 6 MCQ

Professional Development

20 Qs

quiz-placeholder

Similar activities

Physical vs. Chemical Properties/ Changes

Physical vs. Chemical Properties/ Changes

KG - Professional Development

15 Qs

Revision Mass, Volume, and Density

Revision Mass, Volume, and Density

Professional Development

15 Qs

Speed velocity and motion

Speed velocity and motion

8th Grade - Professional Development

20 Qs

Operating System

Operating System

Professional Development

20 Qs

KINETIC MOLECULAR THEORY OF GASES

KINETIC MOLECULAR THEORY OF GASES

University - Professional Development

15 Qs

Digi Connect 2023

Digi Connect 2023

Professional Development

20 Qs

Are You Smarter Than A 5th Grader

Are You Smarter Than A 5th Grader

KG - Professional Development

15 Qs

CLIMATE CHANGE - ALEXUZ

CLIMATE CHANGE - ALEXUZ

KG - Professional Development

20 Qs

8710 unit 6 MCQ

8710 unit 6 MCQ

Assessment

Quiz

Science

Professional Development

Hard

Created by

Gareth Evans

FREE Resource

20 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Who benefits from accurate measurements?

Contractors

Customers

Workers

All of the above

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Inaccurate measurements could potentially lead to what?

No issues, the labour on site will sort it out

Safety issues as calculations based on dimensions may be incorrect

The job finishes early

More profits being made

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

If a site measurement is given as 25m with a tolerance of ± 0.5%, what is the permissible range of measurement?

20m - 30m

24.75m - 25.7 m

24.875m - 25.125m

24.25m - 25.25m

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When producing an estimate, ABC refers to?

All building contracts

Activity-based costing

Accounting by calculation

A basic calculation

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Batch costing is …

A method of costing when an identical product, task or component is produced in a large number at a time. All units produced at one time are collectively known as a batch. The cost is divided by the number of units to establish item costs.

The process of compiling all costs that the owner or producer of an asset will incur over its lifespan. These costs include the initial investment, future additional investments and annually recurring costs, minus any salvage value.

A methodology used to track the expense of creating a unique product. Due to the fact certain projects require different operations, accountants use this methodology to trace the expenses of each job.

Work is charged at a standard labour rate per hour, plus the actual cost of materials used. The cost is calculated when the job is complete.

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The most appropriate way to measure the length of a trench for pipework between buildings with multiple bends is?

Laser

Fabric tape measure

Pace it out

Measuring wheel

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does SI stand for when referring to SI units?

Simple indicators

Standards international

Systeme international

Systeme indicators

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?