don't look

don't look

11th Grade

20 Qs

quiz-placeholder

Similar activities

CPA CPF1 System Specifications

CPA CPF1 System Specifications

8th Grade - Professional Development

16 Qs

Reading a Tape Measure

Reading a Tape Measure

9th - 12th Grade

20 Qs

ICS 100 Unit 1-3 Quiz

ICS 100 Unit 1-3 Quiz

10th - 12th Grade

15 Qs

TDLR Quiz

TDLR Quiz

10th - 12th Grade

25 Qs

miter saw safety

miter saw safety

9th - 12th Grade

15 Qs

Safety Quiz

Safety Quiz

9th - 12th Grade

20 Qs

Electrical Conduit Quiz

Electrical Conduit Quiz

11th Grade

15 Qs

Nails and Hammering Techniques

Nails and Hammering Techniques

9th Grade - University

20 Qs

don't look

don't look

Assessment

Quiz

Instructional Technology

11th Grade

Easy

Created by

Electricity Thief

Used 13+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

One of the characteristics of aluminum conduit is that it is?

lightweight

heavy

engineered

segmented

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Dog legs can be avoided by making offset bends by doing what?

Maintaining a centerline for all bends


Screwing a coupling on the conduit

4" from the end of the conduit

2 kick bends in opposite directions

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which combination of bends between pull points is allowed by the NEC?

The insulation in conductors could be damaged as it is pulled

2 45-degree offsets, 1 elbow, 3 15-degree kicks

2 kick bends in opposite directions

The cementing and joining operation should not exceed 20 seconds

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A 30-degree kick has a hypotenous of 10 degrees. Given that the cosecant of 30 degrees is 2, determine the side opposite or how far off the surface the end of the kick needs to be

30 inches

5 inches

1 inch

2 inch

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A counduit run must pass over a pipe then over a rectangular duct. This will require a total of how many bends?

Screwing a coupling on the conduit

7 (3 point saddle and 4 point saddle)

4" from the end of the conduit

determine the radius of the inner most bend

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which of the following is true when joining PVC conduit?


Segmented

The cementing and joining operation should not exceed 20 seconds

The insulation in conductors could be damaged as it is pulled

2 kick bends in opposite directions

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

You are making a 14" stub-up in 1" RMC and the bender deduct is listed as 10". Where do you make your first mark?

2" from the end of the conduit

4" from the end of the conduit

1" from the end of the conduit

5" from the end of the conduit

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?