Power Quality (PQ) Program TNB Selangor 2023

Power Quality (PQ) Program TNB Selangor 2023

Professional Development

9 Qs

quiz-placeholder

Similar activities

ProFuturo Quiz

ProFuturo Quiz

Professional Development

10 Qs

M7.7 EWIS Cat-B V7.01

M7.7 EWIS Cat-B V7.01

Professional Development

9 Qs

THE IMPOSSIBLE QUIZ

THE IMPOSSIBLE QUIZ

Professional Development

7 Qs

18th Edition Part 6 Mock 3

18th Edition Part 6 Mock 3

Professional Development

10 Qs

Op Amp

Op Amp

Professional Development

6 Qs

HSE Campaign Quiz Round 5

HSE Campaign Quiz Round 5

Professional Development

10 Qs

Quiz#2 GTAW Equipment

Quiz#2 GTAW Equipment

Professional Development

10 Qs

Quizzz Location System

Quizzz Location System

Professional Development

10 Qs

Power Quality (PQ) Program TNB Selangor 2023

Power Quality (PQ) Program TNB Selangor 2023

Assessment

Quiz

Other

Professional Development

Hard

Created by

Nurulhuda Kamarudin

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

9 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

How many quality of electrical power?

5

3

4

2

2.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

In MSL, what is the performance level to complete investigation of over voltage from complaint received date?

14 Working Days

30 Days

2 Days

30 Working Days

3.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

In the event of voltage sag, what need to be done once TNB shares the cause of the voltage sag?

Restart all affected machines

Record the critical relays & equipment

Identify the relays, control circuits and equipment that were affected

All the answer

4.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

Which is NOT the symptoms of Power Quality?

Equipment running smoothly and normal temperature

Poor performance & unexpected shutdowns

Sudden equipment maloperation

Lights blinking

5.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

There are two types of PQ Incentives. The period of ROI for Accelerated Capital Allowance is 6 years. True or False?

True

False

6.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

Which document is NOT needed for Accelerated Capital Allowance?

Copy of Business License

List of report on power outage

Application Form

Power quality study

7.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

RTT stands for?

Right Through Test

Right To Temp

Ride Through Test

Ride Thou Test

8.

MULTIPLE CHOICE QUESTION

10 sec • 10 pts

Electromagnetic compatibility (EMC) is define as the ability of an equipment or system to function satisfactorily in its

Electromagnetic environment (EE) without introducing intolerable electromagnetic disturbances (ED) to anything in that environment .

True

False

9.

MULTIPLE CHOICE QUESTION

10 sec • 20 pts

Which service indicator mention about number of unplanned interruptions experienced by consumer?

GSL2

MSL2a

GSL1

MSL1a