1.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
How many quality of electrical power?
5
3
4
2
2.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
In MSL, what is the performance level to complete investigation of over voltage from complaint received date?
14 Working Days
30 Days
2 Days
30 Working Days
3.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
In the event of voltage sag, what need to be done once TNB shares the cause of the voltage sag?
Restart all affected machines
Record the critical relays & equipment
Identify the relays, control circuits and equipment that were affected
All the answer
4.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
Which is NOT the symptoms of Power Quality?
Equipment running smoothly and normal temperature
Poor performance & unexpected shutdowns
Sudden equipment maloperation
Lights blinking
5.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
There are two types of PQ Incentives. The period of ROI for Accelerated Capital Allowance is 6 years. True or False?
True
False
6.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
Which document is NOT needed for Accelerated Capital Allowance?
Copy of Business License
List of report on power outage
Application Form
Power quality study
7.
MULTIPLE CHOICE QUESTION
10 sec • 10 pts
RTT stands for?
Right Through Test
Right To Temp
Ride Through Test
Ride Thou Test
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?