1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1. The line in the middle of a control chart is called the:

A. Rule of seven
B. Mean
C. Control limit
D. Specification limit

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2. A project manager is using a cause-and-effect diagram with the team to determine how various factors might be linked to potential problems. In which step of the quality management process is the project manager involved in?

A. Manage quality
B. Plan quality management
C. Control quality
D. Quality troubleshooting

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3. During project execution, a new version of a standard is issued. The project team meets with the quality department to determine how this updated standard will be applied to the current project. Which part of the quality process is this under?

A. Manage quality
B. Plan quality
C. Perform quality control
D. Value engineering

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4. Which of the following BEST describes the results of an increase in quality?

A. Increased productivity, increased cost effectiveness, and increased cost risk
B. Increased productivity, decreased cost effectiveness, and increased cost risk
C. Increased productivity, increased cost effectiveness, and decreased cost risk
D. Increased productivity, decreased cost effectiveness, and decreased cost risk

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5. The project has had a major defect and the project manager has gotten the project team and the process engineers involved in analyzing the situation. Two groups disagree where the fault lies. One of the groups says that the real fault is the age of the equipment. Another says it is the lack of a material for the correct quality. The project manager decides to use a fishbone diagram to help the process. Which of the following would BEST describe what the group is involved in?

A. manage quality
B. marginal analysis
C. control quality
D. quality analysis

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6. All of the following are quality planning tools and techniques except ___

A. Cost-benefit analysis
B. Design of experiment
C. Cost of quality (COQ)
D. Quality audit

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7. The actual testing results for the new computer virtualization project have arrived from the seller. The results indicate the project is not meeting the overall quality requirements. If the project manager meets with team members to analyze the problem, the project manager is involved in:

A. Manage Quality
B. Quality planning
C. Quality control
D. Quality management

Access all questions and much more by creating a free account

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

Already have an account?

Discover more resources for Professional Development