Power System Module 1 (Set 1)

Power System Module 1 (Set 1)

Assessment

Quiz

Fun

Professional Development

Easy

Created by

Johnny Tan

Used 3+ times

FREE Resource

Student preview

quiz-placeholder

11 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image
What is Sarawak Energy main business?

Selling EV cars

Selling energy saving bulbs

Generate, transmit, distribute and selling of electricity to customers

All of the above

2.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image
What is SEB network system operating voltage and frequency

275KV, 132KV, 66KV, 33KV, 11KV & 50Hz

275KV, 132KV, 33KV, 11KV, 0.415KV & 50Hz

275KV, 132KV, 66KV, 33KV, 11KV & 60Hz

275KV, 132KV, 33KV, 11KV, 0.415KV & 60Hz

3.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image
What are the source of generation available in SEB?

Gas

Coal

Hydro

Diesel

All of the above

4.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Media Image

Hybrid stations cover the following:

Mini Hydro

Diesel

Solar

All of the above

5.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

SAIFI means?
System Average Interruption Duration Index
System Average Interrruption Frequency Index

6.

MULTIPLE CHOICE QUESTION

20 sec • 1 pt

Where is Long Semadoh?
Batang Ai
Limbang
Lawas
Kanowit

7.

MULTIPLE SELECT QUESTION

20 sec • 1 pt

Media Image
Which of the following are SEB Hydro Electric Power Plants?

Bakun

Murum

Mukah

Batang Ai

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?