BIM-based Tendering, Awarding, and Biling
Authored by Sarah Tam
Architecture
University

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
42 questions
Show all answers
1.
OPEN ENDED QUESTION
3 mins • 1 pt
Why is BIM-based BOQ better than Conventional BOQ?
Evaluate responses using AI:
OFF
Answer explanation
- better workflows:
(1) no manual calculations based on drawings
(2) Volumes, surfaces, quantities are taken from or computed from the model
- less errors/changes orders/ budget overruns
- better workflows:
(1) no manual calculations based on drawings
(2) Volumes, surfaces, quantities are taken from or computed from the model
- less errors/changes orders/ budget overruns
2.
OPEN ENDED QUESTION
3 mins • 1 pt
What will Quantity take-off (QTO) provide?
Evaluate responses using AI:
OFF
Answer explanation
(1) cost estimates
(2) tendering
(3) bidding
3.
FILL IN THE BLANK QUESTION
1 min • 1 pt
client-side would use QTO to prepare _____
4.
FILL IN THE BLANK QUESTION
1 min • 1 pt
contractor-side would use QTO to prepare _____ and ______
5.
OPEN ENDED QUESTION
3 mins • 1 pt
Please fill in the blank
Evaluate responses using AI:
OFF
Answer explanation
6.
OPEN ENDED QUESTION
3 mins • 1 pt
Evaluate responses using AI:
OFF
Answer explanation
7.
OPEN ENDED QUESTION
3 mins • 1 pt
What is tender
Evaluate responses using AI:
OFF
Answer explanation
- description of the work to be done:
(1) as a bill of quantities (BOQ)
(2) as functional description
- description of the work to be done:
(1) as a bill of quantities (BOQ)
(2) as functional description
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?