PLUS TECHNOLOGY TRANSFER

PLUS TECHNOLOGY TRANSFER

Professional Development

8 Qs

quiz-placeholder

Similar activities

LL Workshop

LL Workshop

Professional Development

13 Qs

Основи на  BIM (Почетно ниво)

Основи на BIM (Почетно ниво)

Professional Development

12 Qs

ITIL 4 Foundation: ITIL SVS (Part 3)

ITIL 4 Foundation: ITIL SVS (Part 3)

Professional Development

10 Qs

Chapter 9:  Automation in Protection Operations

Chapter 9: Automation in Protection Operations

Professional Development

10 Qs

Knowledge Check! - Session 3: CAD to BIM

Knowledge Check! - Session 3: CAD to BIM

Professional Development

5 Qs

ITIL Know the purpose 15 ITIL practices

ITIL Know the purpose 15 ITIL practices

Professional Development

10 Qs

introduction to financial reporting

introduction to financial reporting

Professional Development

10 Qs

Fiscal Management

Fiscal Management

Professional Development

10 Qs

PLUS TECHNOLOGY TRANSFER

PLUS TECHNOLOGY TRANSFER

Assessment

Quiz

Other

Professional Development

Medium

Created by

Farah Kharuddin

Used 4+ times

FREE Resource

8 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Central information repository that can be accessed by all stakeholders in a project called?


Common Data Environment


Data Exchange Specification


Construction Operations Building Information Exchange

Data drop

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does AIR stands for?

Asset information register

Approved information register

Asset integration requirement

Asset information requirements

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of these activities take place at the post construction phase of the project? (select 2 answers)

Building performance monitoring

Model coordination

Overview of design

Asset Information Management

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Information model during the design and construction stage

Building Information Model (BIM)

BIM execution plan (BEP)

Asset Information Model (AIM)

Project Information Model (PIM)

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the main purpose of BIM Asset Management?

Creating 3D models of buildings

Managing and maintaining building assets throughout their lifecycle

Developing architectural designs

Conducting energy efficiency audits

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

BIM Asset Management is only applicable during the construction phase of a building.

True

False

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What role does BIM play in Facility Management?

It helps in the design phase of a building project.

It assists in the procurement of building materials.

It provides real-time data and information for better facility management.

It automates the facility management process.

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the purpose of a Collaborative Environment in BIM?

To create a competitive atmosphere among team members.

To facilitate effective communication and data sharing among project stakeholders.

To limit the usage of technology tools in the construction process.

To enforce strict guidelines on the project team.