Electronic Grade and slope control

Electronic Grade and slope control

Professional Development

20 Qs

quiz-placeholder

Similar activities

Onboarding Day 1

Onboarding Day 1

Professional Development

15 Qs

LCS pipework level 1 7202 unit 111

LCS pipework level 1 7202 unit 111

Professional Development

16 Qs

Construction Toll Road Pre Test

Construction Toll Road Pre Test

Professional Development

15 Qs

Teacher Induction Program (TIP) Training (AM Sessions)

Teacher Induction Program (TIP) Training (AM Sessions)

Professional Development

18 Qs

6th MO Conference 2020 - GYNAECOLOGY

6th MO Conference 2020 - GYNAECOLOGY

Professional Development

20 Qs

Digital Tools - Microsoft Teams

Digital Tools - Microsoft Teams

Professional Development

15 Qs

🌱New Teacher 2023

🌱New Teacher 2023

Professional Development

16 Qs

NCCER Intro to Construction Drawings 1

NCCER Intro to Construction Drawings 1

Professional Development

22 Qs

Electronic Grade and slope control

Electronic Grade and slope control

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Jeremy Beard

Used 1+ times

FREE Resource

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do the hydraulic cylinders adjust on a paver screed?
Tow point elevation
Downward pressure
Clearance elevation
Temperature

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the electronic grade control light at C in the figure?
Pressure
Warning
Correct grade
Level

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What job does a mobile reference beam perform on an asphalt paver?
Senses changes in elevation.
Straightens curves.
Smoothes the asphalt.
Detects the center line.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

On what is a paver ski designed to ride?
Erect string
Mobile track
Paver wheels
The surface being paved

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What type of pressure is used to adjust the tilt on a paver screed?
Mechanic
Pneumatic
Hydraulic
Hydronic

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What does the word “fill” mean when used in surveying?
Hump or high spot
Grade elevation change
Incline angle
Distance above hub

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What do surveyors install to identify a known elevation in preparation to install a stingline?
Hubs
Sting pipes
Steel stakes
Surveyor pods

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?