جزء دكتور شحاتة

جزء دكتور شحاتة

University

46 Qs

quiz-placeholder

Similar activities

J.61SAT00.059.1 INSTALASI VSAT TVRO

J.61SAT00.059.1 INSTALASI VSAT TVRO

University

41 Qs

Special Populations: - Mock Final Exam (Winter 2025 - Josh)

Special Populations: - Mock Final Exam (Winter 2025 - Josh)

University

50 Qs

Protein Engineering - Retest

Protein Engineering - Retest

University

45 Qs

Segundo parcial-Frutales ISA Mar-2025

Segundo parcial-Frutales ISA Mar-2025

University

43 Qs

Dental Materials Week 10

Dental Materials Week 10

University

50 Qs

Preliminary Examination in Abnormal Psychology (PSY108)

Preliminary Examination in Abnormal Psychology (PSY108)

University

50 Qs

HABITOS SALUDABLES Y SSTT

HABITOS SALUDABLES Y SSTT

9th Grade - University

42 Qs

Pharmacology 1

Pharmacology 1

University

45 Qs

جزء دكتور شحاتة

جزء دكتور شحاتة

Assessment

Quiz

Science

University

Practice Problem

Easy

Created by

Moaz Sayed

Used 144+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

46 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

1-.......It is the first stage of Project cycle.

a-Evaluation project

b-Project preparation.

C-Determine the project

d-Posti_mplementation evaluation.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

2-.......It is the Second Stage of Project Cycle.

a-Evaluation project

b-Project preparation

C-Determine the project

d-Post_implementation evaluation.

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

3-............It is Third Stage of Project Cycle.

a-Evaluation project

b-Project preparation

C-Determine the project

d-Post_implementation evaluation.

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

4-.......It is the fourth stage of Project cycle.

a-Evaluation project

b-Project preparation

C-Determine the project

d-implementation of project

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

5-....... It is the fifth stage of Project cycle.

a-Evaluation project

b-Project preparation

C-Determine the project

d-Post_implementation evaluation

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

6-of project ideas.

a-Background of the owner

b-Technical possibility of the project.

C-exploiting untapped resources.

d-Preserving natural resources.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

7-Of project ideas.

a-a need for the project

b-Technical possibility of the project.

C-The experience of the owner

d-Preserving natural resources.

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?