
Unit 4- Buildings and Architecture
Authored by Jessica Gronow
English
4th Grade
CCSS covered
Used 5+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
14 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
A plan for doing something is called a ...
weight
construction site
schedule
drill
Tags
CCSS.RI.4.5
CCSS.RI.3.3
CCSS.RI.4.3
CCSS.RI.5.3
CCSS.RI.5.5
2.
MATCH QUESTION
1 min • 5 pts
Match the following
To hold something up
Cement
Building site
Weight
A paste used to hold things together
Drill
A tool used for making holes
Construction site
Downward force of something
Support
3.
HOTSPOT QUESTION
1 min • 1 pt
Find the following: beam, column
4.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
By putting 'tar' on the foundation, it helps keep out...
ants
moisture
people
roof
Tags
CCSS.RI.4.5
CCSS.RI.3.3
CCSS.RI.4.3
CCSS.RI.5.3
CCSS.RI.3.5
5.
FILL IN THE BLANK QUESTION
1 min • 1 pt
The ____________ is somebody who measures the foundation of the house before it is built.
Tags
CCSS.L.1.6
CCSS.L.3.6
CCSS.L.4.6
CCSS.L.K.5A
6.
DROPDOWN QUESTION
1 min • 1 pt
The (a) of the house is finished last.
Tags
CCSS.RF.3.3B
CCSS.RF.3.3C
CCSS.RF.3.3D
CCSS.RF.4.3A
CCSS.RF.5.3A
7.
MULTIPLE CHOICE QUESTION
30 sec • 1 pt
To keep the house warm, builders will put _____________ on the inside of the walls.
cement
food
stone
insulation
Tags
CCSS.RI.4.4
CCSS.RI.5.4
CCSS.RL.3.4
CCSS.RL.4.4
CCSS.RL.5.4
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?