CMT 210 Chapter 3-4
Authored by Lil Sway
Education
University
Used 5+ times

AI Actions
Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...
Content View
Student View
20 questions
Show all answers
1.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
Product data submittals, samples, and _____________are required primarily for the architect and engineer to verify that the correct products will be installed on the project.
submittals
shop drawings
bid forms
addenda
2.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
samples should be stored at the jobsite and compared to
schedule
samples
materials delivered
jobsite layout
3.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
size and physical characteristics should be reviewed by both the contractors and the
owner
contractor
engineer
architect
4.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
the project manual typically includes
supplier
bid forms
materials
samples
5.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
the __________ are the base of reference for determining responsibility and liability for actions by the owner and contractor during the project period.
conditions of contract
labor agreement
mediation
none of the above
6.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
the design for construction projects is typically developed by the contractor and the architect. T/F
true
false
7.
MULTIPLE CHOICE QUESTION
20 sec • 1 pt
a ___________ is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator
materials
samples
shop drawing
bid forms
Access all questions and much more by creating a free account
Create resources
Host any resource
Get auto-graded reports

Continue with Google

Continue with Email

Continue with Classlink

Continue with Clever
or continue with

Microsoft
%20(1).png)
Apple
Others
Already have an account?