Phase 2 Exam prep 4

Phase 2 Exam prep 4

Professional Development

40 Qs

quiz-placeholder

Similar activities

Special Quiz on Bank's Learners Day- 21/11/2022

Special Quiz on Bank's Learners Day- 21/11/2022

Professional Development

35 Qs

FUEL & WATER SUPER TANK

FUEL & WATER SUPER TANK

Professional Development

41 Qs

Maruti Suzuki - Recruitment Test - New Joinees

Maruti Suzuki - Recruitment Test - New Joinees

Professional Development

40 Qs

Electrical Principles 6035-02 | Part 1

Electrical Principles 6035-02 | Part 1

Professional Development

40 Qs

LV0506k

LV0506k

Professional Development

43 Qs

VSM Revision II - Unit 1 to 4

VSM Revision II - Unit 1 to 4

Professional Development

40 Qs

special crime investigation quiz 2 final period

special crime investigation quiz 2 final period

Professional Development

40 Qs

MCAC Elite

MCAC Elite

Professional Development

45 Qs

Phase 2 Exam prep 4

Phase 2 Exam prep 4

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Anthony Price

Used 5+ times

FREE Resource

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Water within a a food preparation area such as a kitchen sink falls within which UK fluid category?

4

5

6

7

2.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Which of the following measurements is a base SI unit?

kg

m/s

m2

l/s

3.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

In a modern CH system incorporating a condensing boiler, what is the expected temperature difference between the flow and the return if designed correctly

4.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Waste water collected from baths, showers and washing machines that is then reused for WC flushing is known as:

Rain water harvesting

Wholesome water

Black water

Grey water

5.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Which pipe within an open vented central heating system allows the system to remain at atmospheric pressure?

Cold feed and expansion pipe

Open vent pipe

Warning pipe

Discharge pipe

6.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Which of the following components is manufactured from pure metal?

22 mm end feed elbow

Double panel, single convector radiator

Lead-free solder

15 mm type a compression fitting

7.

MULTIPLE CHOICE QUESTION

45 sec • 2 pts

Which document is split into five parts and gives the specification for installations inside the buildings conveying water for human consumption?

BSEN 806

BS 6700

The Water Supply Regulations

The Private Water Supplies Regulations

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Professional Development