ISTQB Question Bank 381 to 420

ISTQB Question Bank 381 to 420

Professional Development

40 Qs

quiz-placeholder

Similar activities

ISTQB Foundation 11

ISTQB Foundation 11

Professional Development

40 Qs

Practice exam 3 Thorax, abdomen, and pelvis

Practice exam 3 Thorax, abdomen, and pelvis

Professional Development

35 Qs

PT Exam 2

PT Exam 2

University - Professional Development

42 Qs

META FUN QUIZ

META FUN QUIZ

Professional Development

40 Qs

vocabulary activity 1

vocabulary activity 1

Professional Development

40 Qs

ISTQB Question Bank 541 to 580

ISTQB Question Bank 541 to 580

Professional Development

40 Qs

ISTQB - Mobile Application Testing 02

ISTQB - Mobile Application Testing 02

Professional Development

40 Qs

ISTQB Question Bank 941 to 980

ISTQB Question Bank 941 to 980

Professional Development

40 Qs

ISTQB Question Bank 381 to 420

ISTQB Question Bank 381 to 420

Assessment

Quiz

Science

Professional Development

Medium

Created by

Hiếu Bồ

Used 6+ times

FREE Resource

AI

Enhance your content

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

40 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Which of the following is correct about static analysis tools?
Static analysis tools are used only by developers
Compilers may offer some support for static analysis
Static analysis tools help find failures rather than defects
Static analysis tools require execution of the code to analyze the coverage

2.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Media Image
Which of the following list contains only non-functional tests?

Interoperability (compatibility) testing, reliability testing, performance testing

System testing, performance testing

Load testing, stress testing, component testing, portability testing

Testing various configurations, beta testing, load testing

3.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Media Image
Without testing all possible transitions, which test suite will test all marital statuses?

SO-S1-S2-S4-S1-S4

SO-S1-S2-S3-S1-S2

SO-S1-S4-S1-S2-S3

SO-S1-S2-S3-S4-S1

4.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What test items should be put under configuration management?
The test object, the test material and the test environment
The problem reports and the test material
Only the test object. The test cases need to be adapted during agile testing
The test object and the test material

5.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

Media Image
This part of a program is given:

One

Indefinite

Two

Four

6.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

What is the purpose of test exit criteria in the test plan?
To specify when to stop the testing activity
To set the criteria used in generating test inputs
To ensure that the test case specification is complete
To know when a specific test has finished its execution

7.

MULTIPLE CHOICE QUESTION

15 mins • 1 pt

If a program is tested and 100% condition coverage is achieved, which of the following coverage criteria is then guaranteed to be achieved?
100% branch coverage
100% condition coverage and 100% statement coverage
Equivalence class and boundary value coverage
No other white box coverage criterion is guaranteed to be fulfilled 100%

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?

Discover more resources for Science