[SAFETY GAP CLOSURE] PSM

[SAFETY GAP CLOSURE] PSM

Professional Development

15 Qs

quiz-placeholder

Similar activities

Workplace Health and Safety Quiz

Workplace Health and Safety Quiz

1st Grade - Professional Development

15 Qs

Module 22101

Module 22101

University - Professional Development

15 Qs

POM: Routine Unit Duties

POM: Routine Unit Duties

12th Grade - Professional Development

16 Qs

HSSE MEETING TW IV 2021

HSSE MEETING TW IV 2021

Professional Development

10 Qs

HRM

HRM

Professional Development

15 Qs

HSC - Production

HSC - Production

Professional Development

10 Qs

PT716A_Day8_18601917108_Documentation,Premises andequipment

PT716A_Day8_18601917108_Documentation,Premises andequipment

University - Professional Development

10 Qs

OSHA (AMENDMENT) 2022

OSHA (AMENDMENT) 2022

Professional Development

10 Qs

[SAFETY GAP CLOSURE] PSM

[SAFETY GAP CLOSURE] PSM

Assessment

Quiz

Other

Professional Development

Medium

Created by

Ghadafi Ismail

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Following is the purpose of Pre-Startup Safety Review (PSSR) EXCEPT:

Construction and equipment are in accordance with the design specifications

Procedure is in place and adequate

Training for each affected employee by the changes has been completed

Can meet the project timeline

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Pre-Startup Safety Review (PSSR) shall be performed before a chemical is stored on site at the new or modified facility or equipment or before a chemical is introduce into processing equipment for shutdown facility.

True

False

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Approval by Authority (e.g., DOSH, DOE, BOMBA, etc.) is one of the items that will be verified during Pre-Startup Safety Review (PSSR).

True

False

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Below is the example of changes requiring Management of Change (MOC) to be requested except:

Change the raw material supplier

Change the pump type

Installation of a new production line

Change the process parameter

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A Shift Supervisor noticed a faulty PSV and plan to isolate the PSV for repairing work. Which procedure shall the Shift Supervisor follow?

MOC Procedure

Bypass Management of SCE

6.

MULTIPLE SELECT QUESTION

30 sec • 1 pt

Select all the mandatory approver for Bypass application during "Normal Operation".

Head of Department

Solution Vehicle (SV) Head

SHEQ Division Head

Plant General Manager (PGM)

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

MOC shall be requested and approved at which stage?

During commissioning

Before change being implemented

90 days after commissioning

After HOD requested

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?