Mixed Model Lines

Mixed Model Lines

Professional Development

7 Qs

quiz-placeholder

Similar activities

Schoolwide Enrichment Model Recap

Schoolwide Enrichment Model Recap

University - Professional Development

12 Qs

Model Kompetensi Kepala Sekolah

Model Kompetensi Kepala Sekolah

Professional Development

11 Qs

SimplyInvesting Lesson 4 Quiz

SimplyInvesting Lesson 4 Quiz

1st Grade - Professional Development

10 Qs

Model Kompetensi Guru

Model Kompetensi Guru

Professional Development

10 Qs

Fraud Awareness 2025

Fraud Awareness 2025

Professional Development

10 Qs

Who Wants To Be a Programmer?

Who Wants To Be a Programmer?

University - Professional Development

10 Qs

How do waves behave

How do waves behave

KG - Professional Development

10 Qs

Unit 2: Observation & Assessment of Young Children

Unit 2: Observation & Assessment of Young Children

Professional Development

10 Qs

Mixed Model Lines

Mixed Model Lines

Assessment

Quiz

Education

Professional Development

Hard

Created by

Emlyn Evans

FREE Resource

7 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What best describes the Mixed model line.....?

Different products can be assembled on one common assembly line.

Same products can be assembled on one common line.

Different products can be assembled on different lines.

Same products are kept on a single line.

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A mixed model line allows for batch sizes of how many?

Three

Two

One

Four

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

For one piece flow to work what must be in place?

Just in time

and

Just before runout

Just in sequence

and

Just in case

Just in case

and

Just in time

Just in time

and

Just in sequence

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which reason does not support the use of mixed model lines?

An increase in capacity is required

A reduction in operational costs is required

An increase in flexibility is required

Mass production of one single product

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the foundation of a mixed model line?

Complex layout

Batch layout

Lean layout

Assembly line

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

A mixed model line wil incurr more ___________?

Rolledovers

Changeovers

Changedowns

Exchangers

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many steps are considered when implementing a mixed model line?

Three

Two

One

Four