FTRIWI

FTRIWI

Professional Development

15 Qs

quiz-placeholder

Similar activities

NFPA 20

NFPA 20

Professional Development

12 Qs

INTERNATIONAL FUEL GAS CODES (part 1)

INTERNATIONAL FUEL GAS CODES (part 1)

Professional Development

18 Qs

Requirements for System Components

Requirements for System Components

Professional Development

17 Qs

Requirements for System Types

Requirements for System Types

Professional Development

20 Qs

Prestressed Concrete HW 1c

Prestressed Concrete HW 1c

Professional Development

10 Qs

PRESTRESSED one

PRESTRESSED one

Professional Development

16 Qs

General Knowledge

General Knowledge

Professional Development

15 Qs

B)Prestressed Concrete HW(IBC-318)

B)Prestressed Concrete HW(IBC-318)

Professional Development

11 Qs

FTRIWI

FTRIWI

Assessment

Quiz

Professional Development

Professional Development

Medium

Created by

Jim Lynch

Used 5+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are guidelines for installing the correct size of septic tank. Septic tanks shall have a minimum size of 1,500 gallons. If a larger size is required by local authorities, the contractor shall comply with local codes but allow in his or her bid for the cost associated with such increase in size. 

According to the paragraph above, who is responsible for installing the correct sized septic tank? 

Contractor. 

Property Owner

. Local Authorities.

Plumbing Inspector

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Provide all pipe passing through footings, floors, slabs, and masonry walls with steel pipe sleeves, the inside diameter of which shall be at least 2-inch greater than the outside diameter of the pipe and covering passing through it. Sleeves in exterior walls, slabs on earth, or in any slab which may be wet (after completion of the building) shall be Schedule 40 PVC pipe and shall have the space between the pipe and the sleeves caulked watertight."

According to the paragraph above, what is the minimum difference allowed between the outside diameter of a pipe and the sleeve? 

Sleeve is same size as the pipe

Sleeve is 1 inch larger than the pipe.

Sleeve is 1⁄2 inch larger than the pipe

Sleeve is 1⁄2 inch smaller than the pipe. 

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Provide all pipe passing through footings, floors, slabs, and masonry walls with steel pipe sleeves, the inside diameter of which shall be at least 2-inch greater than the outside diameter of the pipe and covering passing through it. Sleeves in exterior walls, slabs on earth, or in any slab which may be wet (after completion of the building) shall be Schedule 40 PVC pipe and shall have the space between the pipe and the sleeves caulked watertight."

According to the paragraph above, which of the following does NOT apply? 

A pipe sleeve must be either steel or SCH 40 PVC. 

The steel sleeve must be at least 1⁄2 inch greater than the outside diameter of the 

pipe itself. 

A 4 5/8th inch outside diameter pipe passing through any slab must have at least a 

5 1/8th inch pipe sleeve. 

A 4 1⁄2 inch pipe sleeve is sufficient for a 4 inch inside diameter pipe to pass 

through a masonry wall. 

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Provide all pipe passing through footings, floors, slabs, and masonry walls with steel pipe sleeves, the inside diameter of which shall be at least 2-inch greater than the outside diameter of the pipe and covering passing through it. Sleeves in exterior walls, slabs on earth, or in any slab which may be wet (after completion of the building) shall be Schedule 40 PVC pipe and shall have the space between the pipe and the sleeves caulked watertight." 

According to the paragraph above, when installing a sleeve in a poured slab roof what type of material should be used? 

SCH. 40 PVC. 

SCH. 40 Steel

SCH. 80 PVC

SCH. 80 Steel.

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When reading a blueprint where should you look for help when you see a symbol that you do not recognize?

Legend.

Plan view. 

Section views.

Process and Instrumentation Diagrams (P&IDs).

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Media Image

What does the following symbol mean?

Ball valve.

Gate valve. 

Check valve.

Relief valve.

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"Footing Drain: Furnish and install 4 inch drain tile or other type of material approved by local code authority. The contractor is to furnish and place gravel in accordance with requirements of local code authority." 

According to the information above, which of the following is the MOST accurate statement?

Drain tile shall be pitched

Washed gravel must be used. 

Footing drains shall be 4 inches.

Schedule 40 pipe shall be used. 

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?