HVAC project preplanning

HVAC project preplanning

University

9 Qs

quiz-placeholder

Similar activities

Fundamentos GDP - Segundo examen

Fundamentos GDP - Segundo examen

University

10 Qs

Agile

Agile

University

10 Qs

Model dan Media Pembelajaran Inovatif

Model dan Media Pembelajaran Inovatif

University - Professional Development

10 Qs

Ramadan Quiz II

Ramadan Quiz II

KG - University

10 Qs

INCLUSIVE EDUCATION- THE SMART LEARNING OBJECTIVE

INCLUSIVE EDUCATION- THE SMART LEARNING OBJECTIVE

University

10 Qs

Chinh phục nhà tuyển dụng 2022

Chinh phục nhà tuyển dụng 2022

University

13 Qs

Talend - Data Integration

Talend - Data Integration

KG - University

10 Qs

MGT340 CHP 4: PERFORMANCE APPRAISAL

MGT340 CHP 4: PERFORMANCE APPRAISAL

University

10 Qs

HVAC project preplanning

HVAC project preplanning

Assessment

Quiz

Professional Development

University

Hard

Created by

nisya ghani

Used 1+ times

FREE Resource

9 questions

Show all answers

1.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Project objectives are.....

A critical element of a project

management

An element to measure or evaluate

project

An outline for what happening in

project once it successful

An outline for what happening in

project once it successful

2.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Project goals are.....

A critical element of a project

management

An element to measure or evaluate

project

An outline for what happening in

project once it successful

An outline for what happening in

project once it successful

3.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

there is two type of cost

direct field cost

overview cost

direct cost

indirect field cost

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

How many stages in value engineering

6

5

9

3

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

‘Project planning’ is all about ................. and.................

effective policies and methodologies to attain project

objectives. preparing a project for investment by

developing it determines the duties or activities necessary

to complete the project's goals

6.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

long lead times equipment is referring to ...................., ..................... and ....................... that are recognized early in a project to have a delivery time long enough to

directly influence the entire lead time of a project.

equipments

machine

systems

goods

7.

MULTIPLE CHOICE QUESTION

45 sec • 1 pt

the right order in creating critical path method (CPM)

list task, identify task sequence, network diagram, identify CPM, estimate task duration, and calculate float

list task, network diagram, estimate task duration, identify CPM and calculate float

list task, identify task sequence, network diagram, estimate task duration, identify CPM and calculate float

list task, identify task sequence, network diagram, estimate task duration and identify CPM

8.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

how many stages in project planning

5

7

6

8

9.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

There are only two (2) types of task dependencies in the Predecessor field.

true

false