Well Completion Basics

Well Completion Basics

Professional Development

6 Qs

quiz-placeholder

Similar activities

Quiz

Quiz

Professional Development

7 Qs

Pre-Test Refreshment PTK 007

Pre-Test Refreshment PTK 007

Professional Development

10 Qs

PKT Supply_Week-2_June'22

PKT Supply_Week-2_June'22

Professional Development

10 Qs

Team: LEARNING

Team: LEARNING

Professional Development

7 Qs

Sehat Bugar Segar (Sesi I)

Sehat Bugar Segar (Sesi I)

Professional Development

10 Qs

Gamification Survey

Gamification Survey

Professional Development

7 Qs

Effective use of TAs CPD

Effective use of TAs CPD

Professional Development

10 Qs

SKG 16.2 Production Operation Day 5

SKG 16.2 Production Operation Day 5

Professional Development

5 Qs

Well Completion Basics

Well Completion Basics

Assessment

Quiz

Other

Professional Development

Medium

Created by

Chai Fu

Used 9+ times

FREE Resource

6 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

20 sec • 5 pts

Media Image

Which diagram shows well completion?

A

B

A and B

None of the answer

2.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Completion involves

connecting the borehole and payzone

treating the payzone

equipping the well

all of the above

3.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Media Image

Which of the colour highlighted shows upper completion?

red

blue

red and blue

none of the above

4.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

Upper completion involves

sand control

perforation either using TCP or wireline

running and installation of production tubing and accesories

all of the above

5.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The lower completion involves

running and installing production tubing

installing wellhead

perforation either using TCP or wireline

all of the above

6.

MULTIPLE CHOICE QUESTION

30 sec • 5 pts

The well completion operation may be carried out using

drilling rig

workover rig

drilling rig or workover rig

none of the answer