Q4 PDC 3D

Q4 PDC 3D

Professional Development

20 Qs

quiz-placeholder

Similar activities

Bhagawat Gita Quiz 18/12/2024

Bhagawat Gita Quiz 18/12/2024

Professional Development

16 Qs

SJAG Bible Quiz

SJAG Bible Quiz

KG - Professional Development

20 Qs

hroXchange Series Talk 2

hroXchange Series Talk 2

Professional Development

15 Qs

Washing Machine Post CT Test

Washing Machine Post CT Test

Professional Development

20 Qs

FOOD SAFETY DAY

FOOD SAFETY DAY

Professional Development

20 Qs

DRRM Basics

DRRM Basics

Professional Development

18 Qs

MUN QUIZ#2

MUN QUIZ#2

7th Grade - Professional Development

20 Qs

Mystery Audit EEP Quiz

Mystery Audit EEP Quiz

Professional Development

20 Qs

Q4 PDC 3D

Q4 PDC 3D

Assessment

Quiz

Education, Other

Professional Development

Practice Problem

Easy

Created by

Alma Tangcuangco

Used 3+ times

FREE Resource

AI

Enhance your content in a minute

Add similar questions
Adjust reading levels
Convert to real-world scenario
Translate activity
More...

20 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

What section in the Philippine Distribution Code that specifies the technical requirements pertaining to the measurement of electrical quantities associated with the supply of electricity and the procedures for providing metering data for billing and settlement?

2

6

8

9

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Section 7.6.5 (b) of PDC, states the control of voltage can be achieved by managing the Reactive Power supply in the Distribution System

Static VAR compensators

On-Load tap changing transformers

Synchronous condensers

Shunt capacitors and reactors

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The state of a Component when it is not available to perform its intended function due to some event directly associated with that Component.

Outage

Power Interruption

Alert State

Emergency Stag

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Section 6.4.3.5 (f) of PDC states that the data for power transformers shall be provided, if the User System is connected to the Distribution System through a step up transformer.

Rated symmetrical RMS short-circuit current (kA)

Tap changer range, step size and type (on-load or off-load)

Zero sequence reactance for three-legged core type transformer

Winding arrangement

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

The process of matching the offers to supply Energy and provide Ancillary Services with the bids to buy Energy and the operational support required by the Grid.

Scheduling

Dispatch

Bid

Synchronize

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Which of the following is not included in Section 6.2.5.3 of the PDC, the Distribution Development Plan?

Forecasted data for the succeeding 5 years

Sub-transmission capacity expansion

Distribution feeder routing and sizing

A summary of the technical and economic analysis performed to justify the DDP

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Section 2.2.1 (f) of PDC states the functions of the Distribution Management Committee.

Review and recommend standards, procedures, and requirements for Distribution System connection, operation, maintenance, and development

Coordinate Distribution Code dispute resolution and make appropriate recommendations to the ERC

Initiate the Distribution Code enforcement process and make recommendations to the ERC

Initiate and coordinate revisions of the Distribution Code and make recommendations to the ERC

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?