Production Process T1

Production Process T1

University

10 Qs

quiz-placeholder

Similar activities

Quiz CG - Cinéma (film, série, animé, etc.)

Quiz CG - Cinéma (film, série, animé, etc.)

University

10 Qs

LinkedIn Quiz

LinkedIn Quiz

University

10 Qs

CDM 201-MD

CDM 201-MD

University

10 Qs

Robo Quiz - Qurious'20 - Phase 2

Robo Quiz - Qurious'20 - Phase 2

University

10 Qs

Ethics in Educational Technology

Ethics in Educational Technology

2nd Grade - Professional Development

10 Qs

Guess the Actor

Guess the Actor

University

10 Qs

Hollywood and movie industry

Hollywood and movie industry

University

15 Qs

Power Point klasa V

Power Point klasa V

4th Grade - University

14 Qs

Production Process T1

Production Process T1

Assessment

Quiz

Computers, Design, Arts

University

Hard

Created by

Mohamad Suffian

Used 2+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What is the production process development?

The steps involved in creating a digital short film/video, as well as having witnessed the production of a professional short film from concept through completion

The steps involved in creating an illustration and photo, as well as having witnessed the production of a professional short film from concept through completion

The editing involved in creating a digital short film/video, as well as having witnessed the production of a professional short film from concept through completion

The exhibition involved in creating a digital short film/video, as well as having witnessed the production of a professional short film from concept through completion

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Structuring a story is a bit like a puzzle it’s easy to jumble up all the moving pieces if you keep them all in a list. Which is the CORRECT about this statement.

Pilot test

Plot Wave

Plot Diagram

Pilot Simulation

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

what is the key milestone in production process development?

key milestones that must be left so the project can be called a not successful project.

key milestones that must be ended so the project can be called a successful one in the end

key milestones that must be achieved so the project can be called a unsuccessful project.

key milestones that must be achieved so the project can be called a successful one in the end

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

FOUR elements of a character profile EXCEPT?

Physical description

Backstory

Personality traits

Voice description

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

"A modeling technique for making high-resolution models, by manipulating a lower-resolution "cage" model and using software to subdivide for a smoother surface" This statement refers to?

Subdivision Surface Morcking

Subdivision Surface Modelling

Subdivision Surfer Modelling

Substitute Surface Modelling

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

What movie used 120 side-by-side still cameras to create a slow-motion effect?

Jurassic park

Avatar

The matrix

Mission Imposible

7.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

The movie is comprised of about 70% CGI and was filmed in 3D. It still ranks as one of the most expensive movies ever made and is regarded as one of the best uses of CGI in history.

Avatar

The Matrix

Terminator 2

Lord of The Rings

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?