ASU Term_C

ASU Term_C

Professional Development

47 Qs

quiz-placeholder

Similar activities

Facilitating Leaner-Centered Teaching

Facilitating Leaner-Centered Teaching

Professional Development

50 Qs

Let's see what you know, fuel

Let's see what you know, fuel

Professional Development

43 Qs

MGNF - 44

MGNF - 44

Professional Development

45 Qs

TOEFL Listening (Post-test)

TOEFL Listening (Post-test)

9th Grade - Professional Development

50 Qs

PSE-2

PSE-2

Professional Development

50 Qs

B451k HYD

B451k HYD

Professional Development

50 Qs

Verbal Ability Quiz-01

Verbal Ability Quiz-01

Professional Development

50 Qs

PCA-5

PCA-5

Professional Development

50 Qs

ASU Term_C

ASU Term_C

Assessment

Quiz

Professional Development

Professional Development

Easy

Created by

Celestino Cole

Used 6+ times

FREE Resource

47 questions

Show all answers

1.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Electrical conductors of copper, aluminium, etc

2.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Determination of the accuracy of an instrument by finding its variation from some standard measurement.

Example: Calibration of Pressure, Flow & Temperature Transmitters etc.

3.

FILL IN THE BLANK QUESTION

1 min • 1 pt

A large deep ditch filled with water.

4.

FILL IN THE BLANK QUESTION

1 min • 1 pt

a) Relating to a tank: Maximum volume

b) Relating to a specific equipment, a unit or to a plant: Maximum production or output

Example: a) Capacity of LOX/LIN storage Tanks.

b) Capacity of DGAN Compressor

5.

FILL IN THE BLANK QUESTION

1 min • 1 pt

It refers to a control system involving two or more controllers. One instrument measures a process variable (as temperature or pressure) and resets a second process condition (as flow) through another controller.

6.

FILL IN THE BLANK QUESTION

1 min • 1 pt

Any substance which affects the rate of a chemical reaction and which, in general, remains unchanged at the end of the reaction.

7.

FILL IN THE BLANK QUESTION

1 min • 1 pt

System by which D.C. charge of 24 volt is induced across underground pipes to stop/slowdown corrosion.

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development