EAL unit 4 revision 4

EAL unit 4 revision 4

Professional Development

15 Qs

quiz-placeholder

Similar activities

Module 1 les partenaires de l'entreprise

Module 1 les partenaires de l'entreprise

Professional Development

15 Qs

Quiz 3: Protection Against Electric Shock

Quiz 3: Protection Against Electric Shock

12th Grade - Professional Development

10 Qs

Evaluación conductores eléctricos

Evaluación conductores eléctricos

Professional Development

15 Qs

Electrical revision

Electrical revision

Professional Development

20 Qs

Series and Parallel Circuits Quiz

Series and Parallel Circuits Quiz

Professional Development

14 Qs

Electrical Maintenance and Troubleshooting

Electrical Maintenance and Troubleshooting

12th Grade - Professional Development

17 Qs

Ejecución de SPT en Colombia

Ejecución de SPT en Colombia

Professional Development

16 Qs

Quiz 2 ESE

Quiz 2 ESE

Professional Development

10 Qs

EAL unit 4 revision 4

EAL unit 4 revision 4

Assessment

Quiz

Professional Development

Professional Development

Hard

Created by

Gareth Evans

Used 11+ times

FREE Resource

15 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which device is this about: Its I rating must be equal to or above the normal operating current for the circuit.

the cable

the fuse

the accessory

the distribution board

2.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Which device is this about: Its I rating must be equal to or higher than normal current carrying capacity of the protective device?

the cable

the fuse

the accessory

the distribution board

3.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

Calculate the total demand current for a lighting circuit it it contains 20 x 100W GLS lamp units and the diversity factor is 66%

7.8A

8.69

6A

5.7A

4.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

When cabling is routed through insulation, its rated current carrying capacity will be:

decreased

increased

stay the same

be doubled be meter embed

5.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

if the voltage drop in a final circuit is found to be excessive, the corrective action is to:

limit the time under load

boost the voltage through a transformer

increase the CSA of the supply cable

decrease the CSA of the supply cable

6.

MULTIPLE CHOICE QUESTION

30 sec • 1 pt

when overload and over current protection is necessary, which of the following is correct?

Ib>In>It

Ib<In>It

Ib<In<It

Ib>In>Iz

7.

MULTIPLE SELECT QUESTION

45 sec • 1 pt

Which of the following is correct regarding earth fault loop impedance?

Zs can be obtained by enquiry

Ze can be obtained by enquiry

Zs can be obtained by calculation

Zs can be obtained by measurement

Create a free account and access millions of resources

Create resources
Host any resource
Get auto-graded reports
or continue with
Microsoft
Apple
Others
By signing up, you agree to our Terms of Service & Privacy Policy
Already have an account?

Discover more resources for Professional Development