Systems Analysis Part 2

Systems Analysis Part 2

9th Grade

10 Qs

quiz-placeholder

Similar activities

Year 9 - Effects of using ICT

Year 9 - Effects of using ICT

8th - 10th Grade

15 Qs

WJEC ICT Networks KT

WJEC ICT Networks KT

9th - 12th Grade

13 Qs

CodeHS Lessons 2.1 - 2.5

CodeHS Lessons 2.1 - 2.5

8th - 12th Grade

11 Qs

2.2.18 Lesson Review

2.2.18 Lesson Review

9th Grade

15 Qs

1.2.1 RAM and ROM

1.2.1 RAM and ROM

9th - 12th Grade

10 Qs

Operating Systems

Operating Systems

9th - 12th Grade

10 Qs

1.1 OCR Computer Science GCSE

1.1 OCR Computer Science GCSE

9th - 12th Grade

10 Qs

Network Troubleshooting Steps

Network Troubleshooting Steps

9th - 12th Grade

8 Qs

Systems Analysis Part 2

Systems Analysis Part 2

Assessment

Quiz

Computers

9th Grade

Hard

Created by

Steve Borg

Used 3+ times

FREE Resource

10 questions

Show all answers

1.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

During System Implementation

the feasibility study is performed

the new system is programmed and documented by the programmers

the system analyst conducts interviews and distributes questionnaires

the system is installed such that it will be ready for use

2.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Changeover methods

are four stages and each stage must be completed before moving onto the next

consist of examining current business documents

are methods used to switch from the old system to the new system

consists of designing the new system

3.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Direct Changeover

means to switch off the old system and start using the new one.

means to run both the old system and the new system simultaneously for a period of time.

means to have the old system still active, but also to have parts of the new system installed in small chunks.

is where the complete new system is first installed and tested in a small number of departments or branches.

4.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Parallel Changeover

means to switch off the old system and start using the new one.

is where the complete new system is first installed and tested in a small number of departments or branches.

means to have the old system still active, but also to have parts of the new system installed in small chunks.

means to run both the old system and the new system simultaneously for a period of time.

5.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Phased Changeover

means to switch off the old system and start using the new one.

means to have the old system still active, but also to have parts of the new system installed in small chunks.

means to run both the old system and the new system simultaneously for a period of time.

is where the complete new system is first installed and tested in a small number of departments or branches.

6.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Pilot Changeover

means to run both the old system and the new system simultaneously for a period of time.

means to have the old system still active, but also to have parts of the new system installed in small chunks.

is where the complete new system is first installed and tested in a small number of departments or branches.

means to switch off the old system and start using the new one.

7.

MULTIPLE CHOICE QUESTION

1 min • 1 pt

Control and Review

is a set of steps involved in the process of creating a new or modified computerised system

is time consuming as data has to be entered onto both systems

is when the new computerised system is evaluated to ensure that it holds the user's original requirements

is more expensive since it involves running two systems at the same time

Create a free account and access millions of resources

Create resources

Host any resource

Get auto-graded reports

Google

Continue with Google

Email

Continue with Email

Classlink

Continue with Classlink

Clever

Continue with Clever

or continue with

Microsoft

Microsoft

Apple

Apple

Others

Others

By signing up, you agree to our Terms of Service & Privacy Policy

Already have an account?